If we continue at the rate we're going, I would have no problem paying for 1000 Amp service upgrade 21 days from now. However, I'm only getting 800 Amps. Actually, 600 amps worth of panels at first with an 800 amp fused disconnect switch. I'll add the other 200 amp panel a few months down the road. I don't want to draw too much attention from an inspector with 800 amps out the door. I'm leading them to believe I'm changing out my gas furnace to an electric furnace and I'm adding a server rack in the garage to fiddle with.
They will have no idea what's in the recreation room. In fact, I'm disconnecting and pulling out all of the 30A circuits that are in my present panel going to my existing mining closet as well to avoid attention. That will not occur until just before an inspector is expected to arrive. Which means you will not see me mining on the pool for 24 to 48 hours. Bummer... I'll keep you updated on when that occurs. [Hopefully, no more than 2 to 3 weeks from now.]
I'm going to install a couple of 30A outlets overhead in the garage where I will place a server rack and mount a couple of PDU's on it for looks. No equipment will be on the server rack. Also, thanks to that 7 block run in less than 24 hours, I'm getting french doors this week to install downstairs in the entrance to the recreation room where the mining closet is located. That should cut out a ton of noise from coming upstairs.
Happy mining everyone!
David
They will have no idea what's in the recreation room. In fact, I'm disconnecting and pulling out all of the 30A circuits that are in my present panel going to my existing mining closet as well to avoid attention. That will not occur until just before an inspector is expected to arrive. Which means you will not see me mining on the pool for 24 to 48 hours. Bummer... I'll keep you updated on when that occurs. [Hopefully, no more than 2 to 3 weeks from now.]
I'm going to install a couple of 30A outlets overhead in the garage where I will place a server rack and mount a couple of PDU's on it for looks. No equipment will be on the server rack. Also, thanks to that 7 block run in less than 24 hours, I'm getting french doors this week to install downstairs in the entrance to the recreation room where the mining closet is located. That should cut out a ton of noise from coming upstairs.
Happy mining everyone!
David
Wow sounds like a lot of work. Good luck with it all!