Sozialtourist
|
|
May 26, 2018, 08:07:37 PM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Oh really? so they're purchasing an existing plant there? Thats what they did it UK right? My understanding is that it would be more efficient if they go for finished plants. I am not sure about PR plant. Will wait for further details as it is just discussions ongoing. They did both for the UK, they bought two plants and have one being build currently And when is the plant that is currently being build ready to produce electricity? I guess it wont be this year, right? Don't know how long such a construction usually take.
|
|
|
|
rathaha10
Full Member
Offline
Activity: 616
Merit: 108
io.ezystayz.com
|
|
May 26, 2018, 08:52:36 PM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Oh really? so they're purchasing an existing plant there? Thats what they did it UK right? My understanding is that it would be more efficient if they go for finished plants. I am not sure about PR plant. Will wait for further details as it is just discussions ongoing. They did both for the UK, they bought two plants and have one being build currently Finally a clarification. I was never sure if the two power plants were either built or bought. Buying two and building the third one seems to be a good strategy. And I am sure that with their profits they will build more power plants themselves in the future, I think that's cheaper than buying I thought that they bought the power plants in the UK. I also saw people saying that it was bought. Building will take years man. Why build if you can take a working power plant fast ?
|
|
|
|
Owillz
Member
Offline
Activity: 532
Merit: 10
|
|
May 26, 2018, 09:31:31 PM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
After the ICO comes the real work for the project. I am hoping to they can raise the needed amount of capital need to meet all their financial requirements.
|
|
|
|
garyjones
Newbie
Offline
Activity: 17
Merit: 0
|
|
May 27, 2018, 02:59:08 AM |
|
4NEW is a strong token with a great concept and a better team then most. I look forward to watching my value grow next 12 months
|
|
|
|
ibininja
Member
Offline
Activity: 490
Merit: 10
|
|
May 27, 2018, 05:05:34 AM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe There are many factors really; because the there are other spends for example getting debris out of the way and pilling it somewhere. That has a different cost.
|
|
|
|
Btc16b
Newbie
Offline
Activity: 23
Merit: 0
|
|
May 27, 2018, 06:41:32 AM |
|
I don't know about much ICO. But I like this concept that they are generating energy by using waste material. They are caring about the environment.
|
|
|
|
Ace44
Member
Offline
Activity: 672
Merit: 11
|
|
May 27, 2018, 06:56:20 AM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Never knew they were like buying the power plants, thanks for the heads up and yes, from the comments dropping in, i believe that Puerto Rico truly needs the presence of 4NEW and the team has also given us enough reason to believe in their team because they have done proper research and find out that they need the power plant
|
|
|
|
jamzzz123
Member
Offline
Activity: 350
Merit: 16
|
|
May 27, 2018, 08:35:09 AM |
|
I don't know about much ICO. But I like this concept that they are generating energy by using waste material. They are caring about the environment.
Check out this link here first of all for an introduction: https://www.youtube.com/watch?v=UjqcsBQkAwEAlso please checkout there main page at https://www.4new.co.uk The world's first eco-friendly, tangible Waste to Energy blockchain. An exciting project with a real innovative world problem solving concept which will make cryptos green (eco friendly)
|
|
|
|
faulerwilli
|
|
May 27, 2018, 09:16:15 AM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Oh really? so they're purchasing an existing plant there? Thats what they did it UK right? My understanding is that it would be more efficient if they go for finished plants. I am not sure about PR plant. Will wait for further details as it is just discussions ongoing. They did both for the UK, they bought two plants and have one being build currently And when is the plant that is currently being build ready to produce electricity? I guess it wont be this year, right? Don't know how long such a construction usually take. According to the roadmap, the plans for the 3rd power plant will start in Q2 2018 and will be built in 2019. So this year they will work with 2 power plants Of course it can be that the roadmap is no longer up-to-date, because they have often been ahead of their goals
|
|
|
|
Sozialtourist
|
|
May 27, 2018, 12:45:11 PM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Oh really? so they're purchasing an existing plant there? Thats what they did it UK right? My understanding is that it would be more efficient if they go for finished plants. I am not sure about PR plant. Will wait for further details as it is just discussions ongoing. They did both for the UK, they bought two plants and have one being build currently And when is the plant that is currently being build ready to produce electricity? I guess it wont be this year, right? Don't know how long such a construction usually take. According to the roadmap, the plans for the 3rd power plant will start in Q2 2018 and will be built in 2019. So this year they will work with 2 power plants Of course it can be that the roadmap is no longer up-to-date, because they have often been ahead of their goals Okay I see. So the third plant will definitely not be available this year for electricity production. It will be interesting to see how the first two plants are performing and what is more profitable. Mining or selling to the grid.
|
|
|
|
Darkoth89
|
|
May 27, 2018, 01:01:40 PM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Oh really? so they're purchasing an existing plant there? Thats what they did it UK right? My understanding is that it would be more efficient if they go for finished plants. I am not sure about PR plant. Will wait for further details as it is just discussions ongoing. They did both for the UK, they bought two plants and have one being build currently And when is the plant that is currently being build ready to produce electricity? I guess it wont be this year, right? Don't know how long such a construction usually take. According to the roadmap, the plans for the 3rd power plant will start in Q2 2018 and will be built in 2019. So this year they will work with 2 power plants Of course it can be that the roadmap is no longer up-to-date, because they have often been ahead of their goals Okay I see. So the third plant will definitely not be available this year for electricity production. It will be interesting to see how the first two plants are performing and what is more profitable. Mining or selling to the grid. The third plant in the UK anyway. They're in talks to with multiple countries about plants.. So i fully expect them to be at least 5 plants working at the end of 2018.
|
|
|
|
rathaha10
Full Member
Offline
Activity: 616
Merit: 108
io.ezystayz.com
|
|
May 27, 2018, 01:30:09 PM |
|
I don't know about much ICO. But I like this concept that they are generating energy by using waste material. They are caring about the environment.
Check out this link here first of all for an introduction: https://www.youtube.com/watch?v=UjqcsBQkAwEAlso please checkout there main page at https://www.4new.co.uk The world's first eco-friendly, tangible Waste to Energy blockchain. An exciting project with a real innovative world problem solving concept which will make cryptos green (eco friendly) Huh, but i also know another 4New Youtube channel. Is this channel also from 4New ? When you click on the Youtube Logo from the 4New site you will be redirected to their channel on Youtube.
|
|
|
|
ethtrader16
Copper Member
Newbie
Offline
Activity: 658
Merit: 0
Empowering crypto w/ sustainable energy
|
|
May 27, 2018, 01:42:23 PM |
|
I don't know about much ICO. But I like this concept that they are generating energy by using waste material. They are caring about the environment.
Check out this link here first of all for an introduction: https://www.youtube.com/watch?v=UjqcsBQkAwEAlso please checkout there main page at https://www.4new.co.uk The world's first eco-friendly, tangible Waste to Energy blockchain. An exciting project with a real innovative world problem solving concept which will make cryptos green (eco friendly) Huh, but i also know another 4New Youtube channel. Is this channel also from 4New ? When you click on the Youtube Logo from the 4New site you will be redirected to their channel on Youtube. Yes, I saw that. Before sometime someone posted here their YouTube channel link. 4new have their own YouTube channel. Any new video recently updated on their channel?
|
|
|
|
gee777
|
|
May 27, 2018, 01:47:00 PM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Oh really? so they're purchasing an existing plant there? Thats what they did it UK right? My understanding is that it would be more efficient if they go for finished plants. I am not sure about PR plant. Will wait for further details as it is just discussions ongoing. They did both for the UK, they bought two plants and have one being build currently And when is the plant that is currently being build ready to produce electricity? I guess it wont be this year, right? Don't know how long such a construction usually take. According to the roadmap, the plans for the 3rd power plant will start in Q2 2018 and will be built in 2019. So this year they will work with 2 power plants Of course it can be that the roadmap is no longer up-to-date, because they have often been ahead of their goals Okay I see. So the third plant will definitely not be available this year for electricity production. It will be interesting to see how the first two plants are performing and what is more profitable. Mining or selling to the grid. The third plant in the UK anyway. They're in talks to with multiple countries about plants.. So i fully expect them to be at least 5 plants working at the end of 2018. I would love that to happen especially if they can get plants in atleast 7 countries. It would be a big achievement for them.
|
|
|
|
ibininja
Member
Offline
Activity: 490
Merit: 10
|
|
May 27, 2018, 02:24:02 PM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Oh really? so they're purchasing an existing plant there? Thats what they did it UK right? My understanding is that it would be more efficient if they go for finished plants. I am not sure about PR plant. Will wait for further details as it is just discussions ongoing. They did both for the UK, they bought two plants and have one being build currently And when is the plant that is currently being build ready to produce electricity? I guess it wont be this year, right? Don't know how long such a construction usually take. According to the roadmap, the plans for the 3rd power plant will start in Q2 2018 and will be built in 2019. So this year they will work with 2 power plants Of course it can be that the roadmap is no longer up-to-date, because they have often been ahead of their goals Okay I see. So the third plant will definitely not be available this year for electricity production. It will be interesting to see how the first two plants are performing and what is more profitable. Mining or selling to the grid. The third plant in the UK anyway. They're in talks to with multiple countries about plants.. So i fully expect them to be at least 5 plants working at the end of 2018. I would love that to happen especially if they can get plants in atleast 7 countries. It would be a big achievement for them. I am guessing the third plant would sell to the national grid or are there different plans set? This would really be interesting to watch, a third plant and a possible new region.
|
|
|
|
hieusupper89
Newbie
Offline
Activity: 154
Merit: 0
|
|
May 27, 2018, 02:25:38 PM |
|
A wonderful systematically developing project! We need the active participation of all project participants and will benefit all of us.
|
|
|
|
Nathan01
Member
Offline
Activity: 728
Merit: 11
DocTailor IEO on Zloadr
|
|
May 27, 2018, 02:54:02 PM |
|
it's very important that unsold tokens are burned, not doing so just brings risks with it
Risk of which the investors share equal or even more of the ratio. However, I think this has been talked about before and burning was the conclusion of it. Yes, I also heard that they will burn unsold tokens. This is really needed if you want to growth of tokens. As far as i know they have also burned a lot of tokens right now and they have even raised the price per token from $2 to $4 for the 3 day sale. Where did you get this information from? There are still $ 2 / tokens left on the homepage, and I do not think they simply double the price for the 3-day sale. Maybe you are confusing something, because there are predictions that the token might be worth $ 4 after the tokenburn when it's listed on an exchange I think he got the information from the unofficial group where price speculation is allowed but unlike the main group no such increase has been established its still at 2$ per token even in the 3 days pre-listing If they are thinking about this i would advice them to desist from it. They should just leave the token price at $2 per token except they don't plan on achieving the hardcap. What do you mean, they don't plan on achieving the hardcap??? They certainly do.... I think it's very possible aswell considering how well the presale went Of course they want to reach their hardcap (or want to raise as much money as possible) because with the extra money they can buy/build more plants. But I don't think they will reach it. They raised 40 million in the whole sale so far and you expect them to raise another 30 in just 3 days? They have done a good job marketing and keeping up good progress; I think the hard cap is quite hard to reach or hit in 3 days however there is a chance for private investors to jump in with good money. We just wait and see. I think some private investors are already jumping in, lots of activities in the telegram group recently and also you'd know unsold token will be burned, reducing the TC
|
( M P C X ) Revolution ▬▬ • • • [url=http://www.doctailor.com/]DOCTailor ✂️ Unique self-customizing smart legal contract platform[/url] • • • ▬▬ ▬▬▬▬▬ [url=https://bitcointalk.org/index.php?topic=2893424.0]ANN[/url] [url=https://bitcointalk.org/index.php?topic=2887286.msg29675034#msg29675034]Bounty[/url] [url=http://www.doctailor.com/whitepaper-en.pdf]Whitepaper[/url] ▬▬ [url=https://join.slack.com/t/doctailor/shared_invite/enQtMzA1Mzg4NjM2NTYyLTBmNzE4OWUzMGIzMmYzNzAwMTBiMWI3ZDQ3NmFlZDdkMmY4MDRlMDQ5MDdhZmRmMDdjYTNkMGQ0ZDA0ZTI5MGY%5D%5Bcolor=teal%5DSlack%5B/url%5D%7C]Slack[/url] [url=https://www.facebook.com/DocumentTailor-259834644548573]Facebook[/url] [url=https://twitter.com/documenttailor]Twitter[/url] [url=https://t.me/joinchat/GZaHXQ-Bbr7xnrNmjX4zIA]Telegram[/url] [url=https://www.linkedin.com/company/doctailor/]Linkedin[/url] ▬▬▬▬▬ ▌▌ [url=http://www.doctailor.com/#termsSection]Click for PRE-SALE ▬▬▬ IEO: Jul 20th[/url] ▐▐
|
|
|
gee777
|
|
May 27, 2018, 03:43:23 PM |
|
it's very important that unsold tokens are burned, not doing so just brings risks with it
Risk of which the investors share equal or even more of the ratio. However, I think this has been talked about before and burning was the conclusion of it. Yes, I also heard that they will burn unsold tokens. This is really needed if you want to growth of tokens. As far as i know they have also burned a lot of tokens right now and they have even raised the price per token from $2 to $4 for the 3 day sale. Where did you get this information from? There are still $ 2 / tokens left on the homepage, and I do not think they simply double the price for the 3-day sale. Maybe you are confusing something, because there are predictions that the token might be worth $ 4 after the tokenburn when it's listed on an exchange I think he got the information from the unofficial group where price speculation is allowed but unlike the main group no such increase has been established its still at 2$ per token even in the 3 days pre-listing If they are thinking about this i would advice them to desist from it. They should just leave the token price at $2 per token except they don't plan on achieving the hardcap. What do you mean, they don't plan on achieving the hardcap??? They certainly do.... I think it's very possible aswell considering how well the presale went Of course they want to reach their hardcap (or want to raise as much money as possible) because with the extra money they can buy/build more plants. But I don't think they will reach it. They raised 40 million in the whole sale so far and you expect them to raise another 30 in just 3 days? They have done a good job marketing and keeping up good progress; I think the hard cap is quite hard to reach or hit in 3 days however there is a chance for private investors to jump in with good money. We just wait and see. I think some private investors are already jumping in, lots of activities in the telegram group recently and also you'd know unsold token will be burned, reducing the TC In a way burning of tokens will be of more benefit to token holders but achieving the hardcap is more important because more funds will be raised for advancing the project.
|
|
|
|
faulerwilli
|
|
May 27, 2018, 03:52:21 PM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Oh really? so they're purchasing an existing plant there? Thats what they did it UK right? My understanding is that it would be more efficient if they go for finished plants. I am not sure about PR plant. Will wait for further details as it is just discussions ongoing. They did both for the UK, they bought two plants and have one being build currently And when is the plant that is currently being build ready to produce electricity? I guess it wont be this year, right? Don't know how long such a construction usually take. According to the roadmap, the plans for the 3rd power plant will start in Q2 2018 and will be built in 2019. So this year they will work with 2 power plants Of course it can be that the roadmap is no longer up-to-date, because they have often been ahead of their goals Okay I see. So the third plant will definitely not be available this year for electricity production. It will be interesting to see how the first two plants are performing and what is more profitable. Mining or selling to the grid. The third plant in the UK anyway. They're in talks to with multiple countries about plants.. So i fully expect them to be at least 5 plants working at the end of 2018. you are the 4new professional here. If you expect 5 power plants by the end of the year, then I believe you. That's great, 5 power plants at the end of 2018, the dividend will be higher this year than expected. I love it!
|
|
|
|
Darkoth89
|
|
May 27, 2018, 04:43:22 PM |
|
I’m hopeful for this project that we continue to get solid news and announcements from the team as the real work continues and the platforms various parts come together over the next several months after the ico finishes completely
I am looking out for the Puerto Rico news to be honest. It would really be a great case for many others to follow. Since the recovery after the devastating Maria Hurricane is costly. The repairs to the energy grid alone is around $200 mil That 200m sounds a little low for the scale of devastation but theirs going to be a lot of money dumped into redevelopment efforts from private companies to assure they are future proofed going forward I believe Instead of constructing the plant from the scratch, they are buying and progressing faster than expected. So I strongly think this is the most efficient way for progressing also. Oh really? so they're purchasing an existing plant there? Thats what they did it UK right? My understanding is that it would be more efficient if they go for finished plants. I am not sure about PR plant. Will wait for further details as it is just discussions ongoing. They did both for the UK, they bought two plants and have one being build currently And when is the plant that is currently being build ready to produce electricity? I guess it wont be this year, right? Don't know how long such a construction usually take. According to the roadmap, the plans for the 3rd power plant will start in Q2 2018 and will be built in 2019. So this year they will work with 2 power plants Of course it can be that the roadmap is no longer up-to-date, because they have often been ahead of their goals Okay I see. So the third plant will definitely not be available this year for electricity production. It will be interesting to see how the first two plants are performing and what is more profitable. Mining or selling to the grid. The third plant in the UK anyway. They're in talks to with multiple countries about plants.. So i fully expect them to be at least 5 plants working at the end of 2018. you are the 4new professional here. If you expect 5 power plants by the end of the year, then I believe you. That's great, 5 power plants at the end of 2018, the dividend will be higher this year than expected. I love it! it was in there previous video about it, i can't remember the exact countries, but they mentioned at least 2, i'll watch it again later and get the names
|
|
|
|
|