Bitcoin Forum
January 22, 2018, 10:50:50 AM *
News: Electrum users must upgrade to 3.0.5 if they haven't already. More info.
 
   Home   Help Search Donate Login Register  
Pages: « 1 ... 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 [76] 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 »
  Print  
Author Topic: ⚡⛏️[ANN] Giga Watt: Best Home for your Mining. Starts today!  (Read 155318 times)
Mr Frog
Full Member
***
Offline Offline

Activity: 168


Bitcoin is the King


View Profile
September 20, 2017, 08:17:35 PM
 #1501





I did not post this message, The Russians did it !
1516618250
Hero Member
*
Offline Offline

Posts: 1516618250

View Profile Personal Message (Offline)

Ignore
1516618250
Reply with quote  #2

1516618250
Report to moderator
Advertised sites are not endorsed by the Bitcoin Forum. They may be unsafe, untrustworthy, or illegal in your jurisdiction. Advertise here.
1516618250
Hero Member
*
Offline Offline

Posts: 1516618250

View Profile Personal Message (Offline)

Ignore
1516618250
Reply with quote  #2

1516618250
Report to moderator
1516618250
Hero Member
*
Offline Offline

Posts: 1516618250

View Profile Personal Message (Offline)

Ignore
1516618250
Reply with quote  #2

1516618250
Report to moderator
chip1982
Full Member
***
Offline Offline

Activity: 124


View Profile
September 20, 2017, 11:43:18 PM
 #1502

@Mr Frog: Thank you for sharing!  Smiley Smiley
spandreev
Hero Member
*****
Offline Offline

Activity: 756


View Profile
September 21, 2017, 12:02:29 AM
 #1503

Any updates on delays for Batch 3 and Batch 4? 3 weeks no new information from GigaWatt (not count this pics).
inspiredinvestor
Hero Member
*****
Offline Offline

Activity: 616



View Profile WWW
September 21, 2017, 12:08:56 AM
 #1504

Man Mr Frog, those Pics are a tease... Are you able to provide some detail of whay yhe photos are from are they the batch 1 and batch 2 areas and miners being installed? I am looking forward to getting my Batch 3 tokens!!!

▄█████
▄█████████████▄
▄█████████████████████▄
▄█████████████████████████████▄
███████████████████████████████████
█████████████▀       ▀██████████████
██████████▀   ▄▄▄▄▄▄▄  ▀███████████
██████████    █████████    ██████████
█████████    ███▀▀▀▀▀▀▀     █████████
████████     ███▄▄▄▄▄▄       ███████
███████      █████████      ███████
███████       ▀▀▀▀▀▀███     ████████
█████████     ▄▄▄▄▄▄▄███    █████████
██████████    ████████    ██████████
███████████▄  ▀▀▀▀▀▀▀▀   ██████████
██████████████▄       ▄█████████████
███████████████████████████████████
▀█████████████████████████████▀
▀█████████████████████▀
▀█████████████▀
█████▀
   
 
.The Issuance of Tokenized Equity.
▬▬▬ ●  Twitter  Facebook  |  Telegram  ● ▬▬▬
 
 
popistoc
Jr. Member
*
Offline Offline

Activity: 52


View Profile
September 21, 2017, 01:14:40 AM
 #1505






Did you go there or, copy/pasted stuff?

Also -this looks interesting:
https://www.gigawatt.sg/shop/gpu-miners/gigawatt-alpha-1-psu-included-miner-batch-1/
Mr Frog
Full Member
***
Offline Offline

Activity: 168


Bitcoin is the King


View Profile
September 21, 2017, 10:42:05 AM
 #1506

Any updates on delays for Batch 3 and Batch 4? 3 weeks no new information from GigaWatt (not count this pics).
@Mr Frog: Thank you for sharing!  Smiley Smiley
Man Mr Frog, those Pics are a tease... Are you able to provide some detail of whay yhe photos are from are they the batch 1 and batch 2 areas and miners being installed? I am looking forward to getting my Batch 3 tokens!!!
Did you go there or, copy/pasted stuff?

Also -this looks interesting:
https://www.gigawatt.sg/shop/gpu-miners/gigawatt-alpha-1-psu-included-miner-batch-1/

Those Pics are from GigaWatt Telegram. Posted by Dave Carlson & Some others from the staff I suppose.

Regarding the delays it is mainly due to the inspectors who are not helping in making it difficult for GW to meet their objectives. (PSU from BM not UL certified, Inspections,...)
No infos regarding the future Tokens release date.

For the miners things should move by the end of the week... hopefuly.
It's seems that S9 from August batch are on site at GW. Some L3+ (or all) from september batch may have arrived as well or close to arrive. But I am Not 100% sure about it.
The main problem is the PSU. They have found some UL certified but not enough and those take too much space.

I'll keep you in touch as soon as there is more infos on their Telegram.

It's frustrating. I know.
But GW is doing things professionally. The pods looks great & I still very happy and now becoming even proud to have invest in GW.

They will deliver, it only depends on inspectors now.

 Cool


I did not post this message, The Russians did it !
jack.harris
Jr. Member
*
Offline Offline

Activity: 36


View Profile
September 21, 2017, 02:46:28 PM
 #1507

Two important things:

1) In China there is currently a crackdown going on against anything BTC. It may mean that the december batch (from Bitmain, located in China) will never arrive.

2) What has not been addressed so far: Gigawatt does not turn off your miner even when mining profits are lower than MEF (electricity/hosting). Gigawatt does not turn off or destroy your miner, it offers only to ship it to you once it's not profitable anymore. You pay for the costs of shipping/customs which will be a lot if you order several miners.
Mr Frog
Full Member
***
Offline Offline

Activity: 168


Bitcoin is the King


View Profile
September 21, 2017, 03:08:53 PM
 #1508

It's been on my mind for a couple of days that US Gov. may be interfering trying to slow down GW as well. Like the Chinese are doing with BTC and the miners in China.

They seems more friendly right now (Not so much for the last weeks with GW) but you never know what will be the future. Like somebody reminds me on Telegram we are talking about a huge amount of electricity Power for GW in WA.

I did not post this message, The Russians did it !
rafzalan
Full Member
***
Offline Offline

Activity: 238



View Profile
September 21, 2017, 03:17:23 PM
 #1509

Two important things:

1) In China there is currently a crackdown going on against anything BTC. It may mean that the december batch (from Bitmain, located in China) will never arrive.

2) What has not been addressed so far: Gigawatt does not turn off your miner even when mining profits are lower than MEF (electricity/hosting). Gigawatt does not turn off or destroy your miner, it offers only to ship it to you once it's not profitable anymore. You pay for the costs of shipping/customs which will be a lot if you order several miners.

For China, bitcoin mining generates millions of dollars a day in bitcoin that can be sold offshore - i.e., it's a potential source of foreign exchange income. What's more, the more bitcoin rises in price, the higher the dollar-equivalent value of those mining rewards (i.e. currently 12.5 bitcoin every 10 minutes approximately).

And take a look at statement from the exchange ViaBTC, it announced that Its mining pool is unaffected.

Putting this all together suggests to me that mining will continue unaffected, and mining chip producer s like bitmain will continue working.

▌▌   Anonymous and Untraceable     ›› ››   DeepOnion  ‹‹ ‹‹     TOR INTEGRATED & SECURED    ▌▌
▬▬▬▬▬▬▬▬▬     ANN  Whitepaper  FACEBOOK  Twitter  Youtube  Forum     ▬▬▬▬▬▬▬▬▬
▌▌   ••  JOIN AIRDROP 🚀  ••  |||   Download DeepOnion   |||   ✅ Verified with DeepVault    ▌▌
rafzalan
Full Member
***
Offline Offline

Activity: 238



View Profile
September 21, 2017, 03:33:26 PM
 #1510

It's been on my mind for a couple of days that US Gov. may be interfering trying to slow down GW as well. Like the Chinese are doing with BTC and the miners in China.

They seems more friendly right now (Not so much for the last weeks with GW) but you never know what will be the future. Like somebody reminds me on Telegram we are talking about a huge amount of electricity Power for GW in WA.
Why do you think it would be slow down because it takes electricity? Do other facilities also going to be down because they cunsume energy? Even china do not stop mining yet.
US is not china.

▌▌   Anonymous and Untraceable     ›› ››   DeepOnion  ‹‹ ‹‹     TOR INTEGRATED & SECURED    ▌▌
▬▬▬▬▬▬▬▬▬     ANN  Whitepaper  FACEBOOK  Twitter  Youtube  Forum     ▬▬▬▬▬▬▬▬▬
▌▌   ••  JOIN AIRDROP 🚀  ••  |||   Download DeepOnion   |||   ✅ Verified with DeepVault    ▌▌
Mr Frog
Full Member
***
Offline Offline

Activity: 168


Bitcoin is the King


View Profile
September 21, 2017, 04:15:01 PM
 #1511

It's been on my mind for a couple of days that US Gov. may be interfering trying to slow down GW as well. Like the Chinese are doing with BTC and the miners in China.

They seems more friendly right now (Not so much for the last weeks with GW) but you never know what will be the future. Like somebody reminds me on Telegram we are talking about a huge amount of electricity Power for GW in WA.
Why do you think it would be slow down because it takes electricity? Do other facilities also going to be down because they cunsume energy? Even china do not stop mining yet.
US is not china.

Think about it.
If you are an Official in this town in WA.

A company come and take the amount of a small town of electricity. (Could leave the price to increase one day, bad for environment,...). Not creating much job in the process.

This power is used for people around the world and other part of the US to make crypto (Money) out of their miner from China...

Sound good to you ? Maybe not everybody is happy with this project in Wenatchee.

I did not post this message, The Russians did it !
rafzalan
Full Member
***
Offline Offline

Activity: 238



View Profile
September 21, 2017, 04:29:05 PM
 #1512

It's been on my mind for a couple of days that US Gov. may be interfering trying to slow down GW as well. Like the Chinese are doing with BTC and the miners in China.

They seems more friendly right now (Not so much for the last weeks with GW) but you never know what will be the future. Like somebody reminds me on Telegram we are talking about a huge amount of electricity Power for GW in WA.
Why do you think it would be slow down because it takes electricity? Do other facilities also going to be down because they cunsume energy? Even china do not stop mining yet.
US is not china.

Think about it.
If you are an Official in this town in WA.

A company come and take the amount of a small town of electricity. (Could leave the price to increase one day, bad for environment,...). Not creating much job in the process.

This power is used for people around the world and other part of the US to make crypto (Money) out of their miner from China...

Sound good to you ? Maybe not everybody is happy with this project in Wenatchee.
Thay make job, directly and indirectly.
Indirect jobs could be ones who work for power producers.
More important is if thay dont do something illegal why should be shut down?
We look forward to see what will happen to our investment. I wish a huge profit for all of you.
Also they pay tax.

▌▌   Anonymous and Untraceable     ›› ››   DeepOnion  ‹‹ ‹‹     TOR INTEGRATED & SECURED    ▌▌
▬▬▬▬▬▬▬▬▬     ANN  Whitepaper  FACEBOOK  Twitter  Youtube  Forum     ▬▬▬▬▬▬▬▬▬
▌▌   ••  JOIN AIRDROP 🚀  ••  |||   Download DeepOnion   |||   ✅ Verified with DeepVault    ▌▌
rafzalan
Full Member
***
Offline Offline

Activity: 238



View Profile
September 21, 2017, 04:36:27 PM
 #1513

Waiting for devs to come and give us the right answer to these doubts.

▌▌   Anonymous and Untraceable     ›› ››   DeepOnion  ‹‹ ‹‹     TOR INTEGRATED & SECURED    ▌▌
▬▬▬▬▬▬▬▬▬     ANN  Whitepaper  FACEBOOK  Twitter  Youtube  Forum     ▬▬▬▬▬▬▬▬▬
▌▌   ••  JOIN AIRDROP 🚀  ••  |||   Download DeepOnion   |||   ✅ Verified with DeepVault    ▌▌
_UrbanLegendz_
Newbie
*
Offline Offline

Activity: 11

Just a regular guy with regular dreams...


View Profile
September 21, 2017, 04:44:38 PM
 #1514

Wish I would knew about this project earlier  Embarrassed
Lucas Johannesburg
Full Member
***
Offline Offline

Activity: 127


View Profile
September 21, 2017, 07:42:23 PM
 #1515

.
.
.
As time goes by and the 'absence' of any confidence encouraging updates from Gigawatt is causing people to lose trust in GW.
.
.
.
I received the CEO's email about the delay. I have tokens that still aren't issued yet. Nothing has been said since then.
.
.
.
Who thinks GW will go under and cancel the entire project?
fynxgloire
Full Member
***
Offline Offline

Activity: 168


View Profile
September 21, 2017, 08:22:47 PM
 #1516

.
.
.
As time goes by and the 'absence' of any confidence encouraging updates from Gigawatt is causing people to lose trust in GW.
.
.
.
I received the CEO's email about the delay. I have tokens that still aren't issued yet. Nothing has been said since then.
.
.
.
Who thinks GW will go under and cancel the entire project?

I definitely think they are THE BIGGEST SCAM since Madoff.
Why would anyone put money into an IPO?
This is nothing but a ponzi scheme to get money and then they will disappear.
They don't even have backup redundant power facilities like a regular colo.
Be smart and put your money into a tried and trusted colo instead of this ipo ponzi scheme.
Or wait till next year to see if they go bankrupt or not.

I ordered miners from bitmain to be sent directly to giga-watt, giga-watt said to me:
Sure everything is fine tell Bitmain to send your miners directly to us.
After doing it, Giga-watt did  360 and told me they will not be ready till next year!
Now the problem is I cannot change my  delivery address from BItmain so they will be delivered to giga-watt.
I tried contacting giga-watt MULTIPLE times asking them to redirect the miners they will be receiving but so far
they have not responded to a single email from me.
I tried calling their Chief of Technology Jeffrey Field at the number they gave me: 15098997575

Guess what, the number is invalid.
Good luck suckers
Kamal87
Jr. Member
*
Offline Offline

Activity: 56


View Profile
September 21, 2017, 08:50:02 PM
 #1517

thank you for information and thank you for sharing................ Smiley Smiley Smiley Smiley always success
rafzalan
Full Member
***
Offline Offline

Activity: 238



View Profile
September 21, 2017, 09:59:00 PM
 #1518

.
.
.
As time goes by and the 'absence' of any confidence encouraging updates from Gigawatt is causing people to lose trust in GW.
.
.
.
I received the CEO's email about the delay. I have tokens that still aren't issued yet. Nothing has been said since then.
.
.
.
Who thinks GW will go under and cancel the entire project?

I definitely think they are THE BIGGEST SCAM since Madoff.
Why would anyone put money into an IPO?
This is nothing but a ponzi scheme to get money and then they will disappear.
They don't even have backup redundant power facilities like a regular colo.
Be smart and put your money into a tried and trusted colo instead of this ipo ponzi scheme.
Or wait till next year to see if they go bankrupt or not.

I ordered miners from bitmain to be sent directly to giga-watt, giga-watt said to me:
Sure everything is fine tell Bitmain to send your miners directly to us.
After doing it, Giga-watt did  360 and told me they will not be ready till next year!
Now the problem is I cannot change my  delivery address from BItmain so they will be delivered to giga-watt.
I tried contacting giga-watt MULTIPLE times asking them to redirect the miners they will be receiving but so far
they have not responded to a single email from me.
I tried calling their Chief of Technology Jeffrey Field at the number they gave me: 15098997575

Guess what, the number is invalid.
Good luck suckers
Real shame  Embarrassed Embarrassed Embarrassed
Waiting for devs for answer

▌▌   Anonymous and Untraceable     ›› ››   DeepOnion  ‹‹ ‹‹     TOR INTEGRATED & SECURED    ▌▌
▬▬▬▬▬▬▬▬▬     ANN  Whitepaper  FACEBOOK  Twitter  Youtube  Forum     ▬▬▬▬▬▬▬▬▬
▌▌   ••  JOIN AIRDROP 🚀  ••  |||   Download DeepOnion   |||   ✅ Verified with DeepVault    ▌▌
ZedZedNova
Sr. Member
****
Offline Offline

Activity: 358

Ooh La La, C'est Zoom!


View Profile
September 22, 2017, 01:01:32 AM
 #1519

As time goes by and the 'absence' of any confidence encouraging updates from Gigawatt is causing people to lose trust in GW.

Perhaps you have lost trust, but I have not. My tokens are rented and generating income. That's good for me while I wait for my miner to be brought online. I'm expecting the miner to come online before too long as it was due in on 20-Sep, however, I'm not going to panic because it's not online yet. Hell, I'm not even worried.

tu7275301youz@163.com
Jr. Member
*
Offline Offline

Activity: 42


View Profile
September 22, 2017, 02:35:19 AM
 #1520

Looking out for more information about this on the blogs!
Pages: « 1 ... 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 [76] 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 »
  Print  
 
Jump to:  

Sponsored by , a Bitcoin-accepting VPN.
Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!