FUR11
Sr. Member
Offline
Activity: 378
Merit: 250
FURring bitcoin up since 1762
|
|
October 24, 2014, 03:30:36 PM |
|
Huh, always mesmerizing to see how a few words spoken by the right person can influence AM's price on Havelock... Wow!
|
|
|
|
amhash
|
|
October 24, 2014, 03:39:47 PM |
|
Well, this is merely a co-founded cloud mining project and contract, he's selling. This is effectively just a product ASICMiner is selling to people who are interested. The regular AM1 shares own a part of the company, therefore they're de-facto entitled to the revenue of this project (which first flows into the company, dividends only consist of what FC decides to forward to the shareholders)
Actually, the dividend is not up to FC only, which is the theory one, and we make the daily payment , people will find the problem very quickly if there were. We will release more infos of AMHash and let people trust us!!! Though FC didn't say too much, but he did a lots of things for ASICminer, no dividends not means they keep in their pocket, company need capital for reinvestment on chips and now products.
|
AMHashASICMINER ● ROCKMINER ● Purchase from: AMHash (20Th/s min) ● Havelock (1Gh/s min) Cloud-mining contracts: 0.0012 BTC per Gh ● Maintenance fee: $0.001551 per Gh per day ● Upto 6% Christmas Bonus
|
|
|
friedcat (OP)
Donator
Legendary
Offline
Activity: 848
Merit: 1005
|
|
October 24, 2014, 03:43:48 PM |
|
Update
Development The 28nm BE300 engineering batch tapeout was in September 16 with TSMC. The power efficiency is 0.225W/G to 0.343W/G ranging from core voltage of 0.55V to 0.70V. The two main mistakes made in BE200 were dedicatedly addressed and avoided in the whole design stage so we do not expect surprise in frequency and power consumption in real products.
14nm/16nm projects are at pre-evaluation and pre-design stage. It has to be done in 2015 but the starting time of placing orders depends on overall gain vs (NRE/R&D/risks).
Led by Block Erupter Prisma, a series of efforts to reduce component-wise cost and system-wise power efficiency were made.
Production As known by OEM producers, several large batches of BE200 had problems with popping chips affecting whole boards due to the misoperation from the packaging company. It hindered afterwards chip sales and delayed the starting time of Tube/Prisma sales. Later supply of BE200 has no such problem and filtering process on old BE200 is also underway.
Because of the non-open-source status of Prisma and high cost of all other designs, BE200 sales were stopped. Rest BE200 chips will likely be consumed by Prisma and succeeding revises.
The mass production time of BE300 in terms of chip-out date is February to March, 2015.
Operation As sales were seriously hindered by unexpected yield issue of BE200, we had missed many dates with financing the big mining farm of our own. It is still hopeful that all good BE200 will be turned to hashrate before too late and we have liquid profits again before BE300, but from the big picture, the missing of target on BE200, the mis-judgment on OEMs and later yield/financing problem, limited our expansion and profit in this year. But luckily R&D on later products is not much affected.
AM will continue to develop new products, expand its mining farms, deliver machines to miners, as well as make money for shareholders.
There is no any foreseeable plan from AM side on force buy-back, dumping, or any activities on the open stock market. There is no plan of privatization either. The management, R&D, sales as well as marketing is being more and more separated and dedicated to professionals, but the founders will continue to be heavily involved and drive AM in the more and more competitive market. Scenarios of BE100 vs graphics card may never happen again, but we need catch any opportunity on timing window of leads at either technology or deploying/financing resources to win the last battle when mining is still an under-capitalized game.
|
|
|
|
Chris_Sabian
Legendary
Offline
Activity: 896
Merit: 1001
|
|
October 24, 2014, 03:46:35 PM |
|
Update
Development The 28nm BE300 engineering batch tapeout was in September 16 with TSMC. The power efficiency is 0.225W/G to 0.343W/G ranging from core voltage of 0.55V to 0.70V. The two main mistakes made in BE200 were dedicatedly addressed and avoided in the whole design stage so we do not expect surprise in frequency and power consumption in real products.
14nm/16nm projects are at pre-evaluation and pre-design stage. It has to be done in 2015 but the starting time of placing orders depends on overall gain vs (NRE/R&D/risks).
Led by Block Erupter Prisma, a series of efforts to reduce component-wise cost and system-wise power efficiency were made.
Production As known by OEM producers, several large batches of BE200 had problems with popping chips affecting whole boards due to the misoperation from the packaging company. It hindered afterwards chip sales and delayed the starting time of Tube/Prisma sales. Later supply of BE200 has no such problem and filtering process on old BE200 is also underway.
Because of the non-open-source status of Prisma and high cost of all other designs, BE200 sales were stopped. Rest BE200 chips will likely be consumed by Prisma and succeeding revises.
The mass production time of BE300 in terms of chip-out date is February to March, 2015.
Operation As sales were seriously hindered by unexpected yield issue of BE200, we had missed many dates with financing the big mining farm of our own. It is still hopeful that all good BE200 will be turned to hashrate before too late and we have liquid profits again before BE300, but from the big picture, the missing of target on BE200, the mis-judgment on OEMs and later yield/financing problem, limited our expansion and profit in this year. But luckily R&D on later products is not much affected.
AM will continue to develop new products, expand its mining farms, deliver machines to miners, as well as make money for shareholders.
There is no any foreseeable plan from AM side on force buy-back, dumping, or any activities on the open stock market. There is no plan of privatization either. The management, R&D, sales as well as marketing is being more and more separated and dedicated to professionals, but the founders will continue to be heavily involved and drive AM in the more and more competitive market. Scenarios of BE100 vs graphics card may never happen again, but we need catch any opportunity on timing window of leads at either technology or deploying/financing resources to win the last battle when mining is still an under-capitalized game.
Excellent to hear! Thank you for the update!
|
|
|
|
Blazed
Casascius Addict
Legendary
Offline
Activity: 2128
Merit: 1119
|
|
October 24, 2014, 03:50:25 PM |
|
You took that as good news
|
|
|
|
Chris_Sabian
Legendary
Offline
Activity: 896
Merit: 1001
|
|
October 24, 2014, 03:51:11 PM |
|
You took that as good news Well, it is an update after all
|
|
|
|
nycgoat
Member
Offline
Activity: 117
Merit: 10
|
|
October 24, 2014, 03:53:18 PM |
|
It looks like good news, at least AM isn't declaring bankruptcy like some other mining companies.
|
|
|
|
sngwinner
|
|
October 24, 2014, 03:57:14 PM |
|
Fried Cat
Please comment on when share holders can expect dividends and what the companies current financials are. It sounds bad. We might not get dividends until after new chips deploy in 2015 and again that's a maybe.
Please also comment on whether you or other owners are taking a salary from operations or if your only return is from dividends?
|
|
|
|
FUR11
Sr. Member
Offline
Activity: 378
Merit: 250
FURring bitcoin up since 1762
|
|
October 24, 2014, 04:04:02 PM |
|
Development The 28nm BE300 engineering batch tapeout was in September 16 with TSMC. The power efficiency is 0.225W/G to 0.343W/G ranging from core voltage of 0.55V to 0.70V.
Huh, interesting: Initially the low-power-mode of gen 3 (BE200) was supposed to be <0.2W/GHs, now the planned efficiency is only 0.225W/GHs with the BE300s... How come? When will the first physical chips be tested, when will we get to know if the power consumption is fine? Thanks a lot for the update, friedcat!
|
|
|
|
Caesium
|
|
October 24, 2014, 04:04:17 PM |
|
and havelock crashes.
|
|
|
|
havelock
|
|
October 24, 2014, 04:07:34 PM |
|
Sorry folks, FC talks and we crash Working to bring it back up...
|
|
|
|
Chris_Sabian
Legendary
Offline
Activity: 896
Merit: 1001
|
|
October 24, 2014, 04:07:48 PM |
|
and havelock crashes.
Of course. That happens alot though unfortunately. I just hope that they don't pull a MtGox
|
|
|
|
hdbuck
Legendary
Offline
Activity: 1260
Merit: 1002
|
|
October 24, 2014, 04:10:31 PM |
|
Sorry folks, FC talks and we crash Working to bring it back up... Lmfao
|
|
|
|
whalezy
Member
Offline
Activity: 103
Merit: 10
|
|
October 24, 2014, 04:18:55 PM |
|
Crash on a 200 shares buy?? Exactly the opposition I think.
|
|
|
|
friedcat (OP)
Donator
Legendary
Offline
Activity: 848
Merit: 1005
|
|
October 24, 2014, 04:19:32 PM |
|
Development The 28nm BE300 engineering batch tapeout was in September 16 with TSMC. The power efficiency is 0.225W/G to 0.343W/G ranging from core voltage of 0.55V to 0.70V.
Huh, interesting: Initially the low-power-mode of gen 3 (BE200) was supposed to be <0.2W/GHs, now the planned efficiency is only 0.225W/GHs with the BE300s... How come? When will the first physical chips be tested, when will we get to know if the power consumption is fine? Thanks a lot for the update, friedcat! BE200 was supposed to be <0.2W/GHs because we planned that it has some large room of downvoltage. However most room was eaten by the mistake we made in chip and package design. For BE300 in theory it is possible to get lower than 0.225W/GH by stressing the voltage down below 0.55V, but we do not have solid simulation data yet, so let's see after the test chips are out. December 16 is to be expected for us to get the chips. Testing time varies at 3-10 days since we had much more preparation work already done this time.
|
|
|
|
ujka
|
|
October 24, 2014, 04:23:46 PM |
|
Thanks on update. BE300 seems like it's coming as planned.
|
|
|
|
rudi
|
|
October 24, 2014, 04:26:19 PM |
|
Friedcat: Thanks very much for the update, and congratulations for the good work.
|
|
|
|
FUR11
Sr. Member
Offline
Activity: 378
Merit: 250
FURring bitcoin up since 1762
|
|
October 24, 2014, 04:29:39 PM |
|
December 16 is to be expected for us to get the chips. Testing time varies at 3-10 days since we had much more preparation work already done this time.
Alright, great! Please let us know immediately as soon as the initial and most important tests are concluded!!!
|
|
|
|
Blazed
Casascius Addict
Legendary
Offline
Activity: 2128
Merit: 1119
|
|
October 24, 2014, 04:40:43 PM |
|
Wow Havelock sucks...down again. Any chance of moving AM to something more reliable? Any thoughts on some type of non centralized platform (counterparty/ colored coins / etc...)?
|
|
|
|
jdany
|
|
October 24, 2014, 04:41:26 PM |
|
FC -
Your candor is appreciated. When will we get a glimpse of the closing quarter's financials?
Can we get an idea what self mining looks like right now?
|
|
|
|
|