Bitcoin Forum
April 27, 2024, 04:36:30 AM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Warning: One or more bitcointalk.org users have reported that they strongly believe that the creator of this topic is a scammer. (Login to see the detailed trust ratings.) While the bitcointalk.org administration does not verify such claims, you should proceed with extreme caution.
Pages: « 1 ... 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 [57] 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 ... 586 »
  Print  
Author Topic: HashFast announces specs for new ASIC: 400GH/s  (Read 880232 times)
Amy Woodward
Newbie
*
Offline Offline

Activity: 34
Merit: 0



View Profile
October 09, 2013, 04:09:32 PM
 #1121

Update:

Good News!  HashFast will be announcing Contact imminently.

Please check the HashFast Blog for more information.

For those of you wondering how things are going with our chip fabrication, the answer is: Quite well. Everything at the foundry is on schedule (which believe me we are watching like a hawk every day!)

Unfortunately, our agreements with TSMC forbid us going into much, if any, detail about where exactly in the process our wafers are. 'Cause that would be telling.

On the other hand, nothing forbids me writing a general educational article on semiconductor fabrication. Wink

And today, I'd like to introduce you to Front End of Line (FEOL) and Back End of Line (BEOL) fabrication. And the moment in between, when a foundry switches from one to the other.

Front End of Line is the first half of the process, where all the transistors are created.

"FEOL processing refers to the formation of the transistors directly in the silicon. Some steps include growth of the gate dielectric (traditionally silicon dioxide), patterning of the gate, patterning of the source and drain regions, and subsequent implantation or diffusion of dopants to obtain the desired complementary electrical properties."  -- Wikipedia

Back End of Line is the second half of the process, where those transistors are wired up together. An insulating layer is deposited, metal wiring created on top of it, then another layer of insulation, and vias - metal tunnels - to connect layers. They form the wiring that connects the transistors.

"BEOL processing involves creating metal interconnecting wires that are isolated by dielectric layers. The various metal layers are interconnected by etching holes (called "vias") in the insulating material and then depositing [metal] in them. BEOL includes contacts, insulating layers (dielectrics), metal levels, and bonding sites for chip-to-package connections."

The point when the first half of the process (FEOL) is done, and the second begins (BEOL), is an entirely artificial but highly satisfying milestone on the way to finished chips.

Some call it 'Contact', some call it the start of metallization, some just call it progress.

And thus ends my lesson on generic semiconductor manufacturing practices!

** You can read more about semiconductor fabrication here: http://en.wikipedia.org/wiki/Semiconductor_fabrication

For more or less these same words on our blog, you can look here: http://www.hashfast.com/blog

 
1714192590
Hero Member
*
Offline Offline

Posts: 1714192590

View Profile Personal Message (Offline)

Ignore
1714192590
Reply with quote  #2

1714192590
Report to moderator
1714192590
Hero Member
*
Offline Offline

Posts: 1714192590

View Profile Personal Message (Offline)

Ignore
1714192590
Reply with quote  #2

1714192590
Report to moderator
1714192590
Hero Member
*
Offline Offline

Posts: 1714192590

View Profile Personal Message (Offline)

Ignore
1714192590
Reply with quote  #2

1714192590
Report to moderator
BitcoinCleanup.com: Learn why Bitcoin isn't bad for the environment
Advertised sites are not endorsed by the Bitcoin Forum. They may be unsafe, untrustworthy, or illegal in your jurisdiction.
-Redacted-
Hero Member
*****
Offline Offline

Activity: 574
Merit: 501


View Profile
October 09, 2013, 04:21:17 PM
 #1122

So, even though you can't say anything, I would guess that you're roughly at about step 128 of 247 total....
crumbs
Full Member
***
Offline Offline

Activity: 210
Merit: 100



View Profile
October 09, 2013, 04:22:37 PM
 #1123

[Amy explains how chips are made by rewording a wikip article]

Thanks, Amy.  I feel smarter already.
@Cypherdoc:  I take it you're still on the payroll?
cypherdoc
Legendary
*
Offline Offline

Activity: 1764
Merit: 1002



View Profile
October 09, 2013, 04:25:13 PM
 #1124

[Amy explains how chips are made by rewording a wikip article]

Thanks, Amy.  I feel smarter already.
@Cypherdoc:  I take it you're still on the payroll?

no i am not.

i just believe i'm in the right camp for the long run.
mgio
Hero Member
*****
Offline Offline

Activity: 546
Merit: 500


View Profile
October 09, 2013, 04:26:55 PM
 #1125

Update:

Good News!  HashFast will be announcing Contact imminently.

Please check the HashFast Blog for more information.

For those of you wondering how things are going with our chip fabrication, the answer is: Quite well. Everything at the foundry is on schedule (which believe me we are watching like a hawk every day!)

Unfortunately, our agreements with TSMC forbid us going into much, if any, detail about where exactly in the process our wafers are. 'Cause that would be telling.

On the other hand, nothing forbids me writing a general educational article on semiconductor fabrication. Wink

And today, I'd like to introduce you to Front End of Line (FEOL) and Back End of Line (BEOL) fabrication. And the moment in between, when a foundry switches from one to the other.

Front End of Line is the first half of the process, where all the transistors are created.

"FEOL processing refers to the formation of the transistors directly in the silicon. Some steps include growth of the gate dielectric (traditionally silicon dioxide), patterning of the gate, patterning of the source and drain regions, and subsequent implantation or diffusion of dopants to obtain the desired complementary electrical properties."  -- Wikipedia

Back End of Line is the second half of the process, where those transistors are wired up together. An insulating layer is deposited, metal wiring created on top of it, then another layer of insulation, and vias - metal tunnels - to connect layers. They form the wiring that connects the transistors.

"BEOL processing involves creating metal interconnecting wires that are isolated by dielectric layers. The various metal layers are interconnected by etching holes (called "vias") in the insulating material and then depositing [metal] in them. BEOL includes contacts, insulating layers (dielectrics), metal levels, and bonding sites for chip-to-package connections."

The point when the first half of the process (FEOL) is done, and the second begins (BEOL), is an entirely artificial but highly satisfying milestone on the way to finished chips.

Some call it 'Contact', some call it the start of metallization, some just call it progress.

And thus ends my lesson on generic semiconductor manufacturing practices!

** You can read more about semiconductor fabrication here: http://en.wikipedia.org/wiki/Semiconductor_fabrication

For more or less these same words on our blog, you can look here: http://www.hashfast.com/blog

 

What he is saying is that they are halfway done in making the chips, lol. For those of you who can't read between the lines.

They may be on schedule but it seems awfully aggressive for finished devices that are supposed to beginning shipping out in just 11 days. I really hope they make their target, especially since I have one of the first baby jets ordered.
-Redacted-
Hero Member
*****
Offline Offline

Activity: 574
Merit: 501


View Profile
October 09, 2013, 04:35:19 PM
Last edit: October 09, 2013, 04:57:52 PM by -Redacted-
 #1126

And 128/247 is approximately 1/2 for those of you that can't do math...
cedivad
Legendary
*
Offline Offline

Activity: 1176
Merit: 1001



View Profile
October 09, 2013, 04:50:27 PM
 #1127

And 247/128 is approximately 1/2 for those of you that can't do math...
Actually, it's around 2. Anyway, is there a table describing these steps out there? I suppose them to be on time, and that the second half of the steps is faster to go trough than the first half.

My anger against what is wrong in the Bitcoin community is productive:
Bitcointa.lk - Replace "Bitcointalk.org" with "Bitcointa.lk" in this url to see how this page looks like on a proper forum (Announcement Thread)
Hashfast.org - Wiki for screwed customers
Amy Woodward
Newbie
*
Offline Offline

Activity: 34
Merit: 0



View Profile
October 09, 2013, 04:51:04 PM
 #1128

What he is saying is that they are halfway done in making the chips, lol. For those of you who can't read between the lines.

They may be on schedule but it seems awfully aggressive for finished devices that are supposed to beginning shipping out in just 11 days. I really hope they make their target, especially since I have one of the first baby jets ordered.

The back end of line tends to go significantly faster than the front end of line.

That said. It took a week longer to tape out than we had hoped. (This kind of thing happens a lot in the world of asics.) So yes: we'd hoped to have silicon out of fab in mid October, and now it's looking like late October. Again, we cannot go into more detail than that, due to the preferences of our foundry.

Then, once the silicon is out, we are doing everything we can (including hand-carrying silicon wafers from foundry to the next steps, in Silicon Valley) to get product to our customers as quickly as possible. Best case scenario is five days from wafers-out-of-fab to boot up of the first Baby Jet.

- Amy
cypherdoc
Legendary
*
Offline Offline

Activity: 1764
Merit: 1002



View Profile
October 09, 2013, 04:58:08 PM
 #1129

remember we are dealing with a TSMC rocket launch which is the best in the industry. 

if they can't get it done, no one can.
-Redacted-
Hero Member
*****
Offline Offline

Activity: 574
Merit: 501


View Profile
October 09, 2013, 04:58:53 PM
 #1130

And 247/128 is approximately 1/2 for those of you that can't do math...
Actually, it's around 2. Anyway, is there a table describing these steps out there? I suppose them to be on time, and that the second half of the steps is faster to go trough than the first half.

LOL - fixed.  I guess if I'm trying to make a sarcastic remark, I should get my numbers the right-way-around....
regular
Sr. Member
****
Offline Offline

Activity: 297
Merit: 250


View Profile
October 09, 2013, 05:00:30 PM
 #1131

Are the boards and cases sourced already for the chips to be assembled into?
Amy Woodward
Newbie
*
Offline Offline

Activity: 34
Merit: 0



View Profile
October 09, 2013, 05:04:07 PM
 #1132

Are the boards and cases sourced already for the chips to be assembled into?

Yes.
cypherdoc
Legendary
*
Offline Offline

Activity: 1764
Merit: 1002



View Profile
October 09, 2013, 05:04:09 PM
 #1133

And 247/128 is approximately 1/2 for those of you that can't do math...
Actually, it's around 2. Anyway, is there a table describing these steps out there? I suppose them to be on time, and that the second half of the steps is faster to go trough than the first half.

there is a great chart out there called a Waterfall.  i've seen several versions of it as it's been updated routinely by TSMC.

i've tried to get them to show it to you guys but apparently there's something proprietary about it.  if you saw it, it'd knock your socks off as it relates to the competition.
naRky
Sr. Member
****
Offline Offline

Activity: 350
Merit: 250


Bitcoin is the future...


View Profile
October 09, 2013, 05:08:14 PM
 #1134

Are the boards and cases sourced already for the chips to be assembled into?

Yes.

some pics?





▄██▄
▀███
   █
    █
     █
      █
      ▄██▄▄▄▄▄▄▄▄▄▄▄▄▄▄██▄▄▄▄▄▄▄▄▄▄▄▄▄██▄
      ▀██▀            ▀█▀            ▀██▀
         ▀▄           ▄▀
           ▀▄        ▄▀
             ▀▄     ▄▀
               ▀▄  ▄▀
                ▄██▄
                ▀██▀
                              █
                             ███
                            █████
                           ███ ███
                          ███   ███
                         ███     ███
                        ███       ███
                       ███         ███
                      ███           ███
                     ███             ███
                    ███               ███
                    ██                 ███
                    ██                  ███
                 █  ██                   ███
                ██  ██                    ███
               ███  ██                     ███
              ████  ██                      ███
             █████  ██ ▄███████████▄         ███
            ███ ██  █████▀       ▀████▄       ███
           ███  ██  ██▀              ▀██       ███
          ███   ██     ▄███████████▄   ██       ███
         ███    ██    ██▀         ▀██   ██       ███
        ███     ██   ██             ██  ██        ███
       ███      ██  ██               ██  ██        ███
      ███       ██  ██               ██  ██         ███
     ███        ██  ██               ██  ██          ███
    ███         ██  ██               ██  ██           ███
   ███           ██  ██             ██   ██            ███
  ███            ██   ██▄         ▄██    ██             ███
 ███              ██   ▀███████████▀     ██              ███
███                ██▄              ▄██  ██               ███
 ███▄               ▀████▄       ▄█████  ██             ▄███
   ▀███▄               ▀███████████▀ ██  ██          ▄███▀
      ▀███▄                          ██  ██       ▄███▀
         ▀███▄                       ██  ██    ▄███▀
            ▀███▄                    ██  ██ ▄███▀
               ▀███▄                 ██  ████▀
                  ▀███▄              ██  █▀
                     ▀███▄         ▄███
                        ▀███▄   ▄███▀
                           ▀█████▀








▄██▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄██▄
▀██▀             ▀██▀    
                 █
                █
               █
              █
             █
          ▄██▄
          ▀██▀
Amy Woodward
Newbie
*
Offline Offline

Activity: 34
Merit: 0



View Profile
October 09, 2013, 05:16:01 PM
 #1135

Are the boards and cases sourced already for the chips to be assembled into?

Yes.

To be more verbose...

Similar to what we did with Uniquify, we have been working extremely closely with both the board manufacturer / assembly house, and with the company that will be assembling the finished Baby Jets and Sierras. We are in daily, often hourly contact with them.
 
I'll request pix.
Puppet
Legendary
*
Offline Offline

Activity: 980
Merit: 1040


View Profile
October 09, 2013, 05:25:44 PM
 #1136

That said. It took a week longer to tape out than we had hoped. (This kind of thing happens a lot in the world of asics.) So yes: we'd hoped to have silicon out of fab in mid October, and now it's looking like late October.
..
 Best case scenario is five days from wafers-out-of-fab to boot up of the first Baby Jet.

IOW, even in the best case scenario,  "october" shipments almost certainly wont happen before november.
But everything is on track Smiley.
calichomp
Newbie
*
Offline Offline

Activity: 17
Merit: 0


View Profile
October 09, 2013, 06:03:23 PM
 #1137

Are the boards and cases sourced already for the chips to be assembled into?

Yes.

To be more verbose...

Similar to what we did with Uniquify, we have been working extremely closely with both the board manufacturer / assembly house, and with the company that will be assembling the finished Baby Jets and Sierras. We are in daily, often hourly contact with them.
 
I'll request pix.


Not that we don't believe you about having already sourced the boards and cases.  Can you divulge who is providing these services for you?  Who is doing your board manufacturing?  Who is doing your board assembly?  Who is doing your system integration.

Seems to me like you won't hit October, as promised.
cypherdoc
Legendary
*
Offline Offline

Activity: 1764
Merit: 1002



View Profile
October 09, 2013, 06:24:18 PM
 #1138

Are the boards and cases sourced already for the chips to be assembled into?

Yes.

To be more verbose...

Similar to what we did with Uniquify, we have been working extremely closely with both the board manufacturer / assembly house, and with the company that will be assembling the finished Baby Jets and Sierras. We are in daily, often hourly contact with them.
 
I'll request pix.


Not that we don't believe you about having already sourced the boards and cases.  Can you divulge who is providing these services for you?  Who is doing your board manufacturing?  Who is doing your board assembly?  Who is doing your system integration.

Seems to me like you won't hit October, as promised.

they can't divulge that stuff.  you should know better.  what good would it do giving it to some random internet guy who could actually be a competitor.

you're right in that delivery is going to be close.  but even KNC was/is late.
Micky25
Legendary
*
Offline Offline

Activity: 974
Merit: 1000



View Profile
October 09, 2013, 06:30:04 PM
 #1139

sounds legit to me, lets see and hope the best  Smiley
calichomp
Newbie
*
Offline Offline

Activity: 17
Merit: 0


View Profile
October 09, 2013, 06:35:04 PM
 #1140

Are the boards and cases sourced already for the chips to be assembled into?

Yes.

To be more verbose...

Similar to what we did with Uniquify, we have been working extremely closely with both the board manufacturer / assembly house, and with the company that will be assembling the finished Baby Jets and Sierras. We are in daily, often hourly contact with them.
 
I'll request pix.


Not that we don't believe you about having already sourced the boards and cases.  Can you divulge who is providing these services for you?  Who is doing your board manufacturing?  Who is doing your board assembly?  Who is doing your system integration.

Seems to me like you won't hit October, as promised.

they can't divulge that stuff.  you should know better.  what good would it do giving it to some random internet guy who could actually be a competitor.

you're right in that delivery is going to be close.  but even KNC was/is late.

They can tell us that their fab is TSMC but can't tell us who is making/assembling their boards?  Give me a break; that is the easy part.  Also: I don't know better and I'm sure everyone who has a preorder would feel better if they knew that your partners who are following through to the end are as reputable as TSMC.
Pages: « 1 ... 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 [57] 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 ... 586 »
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!