Uliss
|
|
March 16, 2014, 12:16:15 PM Last edit: March 16, 2014, 02:17:03 PM by Uliss |
|
Дa кoгдa жe вы, бapaны, нayчитecь кapтинки из цитaт yбиpaть ? ? ?
translate Yes when you sheep, learn how to remove pictures of the quotes ? ? ?
|
|
|
|
rmines
|
|
March 16, 2014, 01:29:21 PM |
|
It's not allowed to post in any other languages than English, please translate your post or remove it.
|
|
|
|
kazzanzaki
Newbie
Offline
Activity: 18
Merit: 0
|
|
March 16, 2014, 07:30:34 PM |
|
Дa кoгдa жe вы, бapaны, нayчитecь кapтинки из цитaт yбиpaть ? ? ?
translate Yes when you sheep, learn how to remove pictures of the quotes ? ? ?
Пpивeт Uliss, этo иx фиpмeнный знaк oднa кapтинкa нa нecкoлькo cтpaниц,[OVER] kzzzk
|
|
|
|
klondike_bar
Legendary
Offline
Activity: 2128
Merit: 1005
ASIC Wannabe
|
|
March 17, 2014, 09:12:08 PM |
|
Building a bigger, better anthill now that the weather is getting warm and I cant fit anything else on my limited apartment circuits. You can see a before-and-after: went from a storage area in the back of an office to what will become a high-capacity rack. 2x L6-30 circuits (213V, 30A each) - Currently using an unmetered PDU with C13 outlets 1x L21-20 circuit (120V, 20A,20A,20A) - Currently using a metered PDU with L5-20 outlets 1x 5-20 circuit with duplex outlet approximately 15kW of power available under 80% rule of thumb, with about 4kW of equipment once I move a few more things in, a bunch more antminers showing up thursday, and leaving lots of room to grow. Not sure what I will hit first - power limits or cooling limits (industrial 600V A/C) There is a 1200W Corsair PSU, plus 3x 835W server power supplies wired up and ready to go. All of them will use 213V power for a bit better efficiency
|
|
|
|
AnnInter
Newbie
Offline
Activity: 30
Merit: 0
|
|
March 18, 2014, 05:46:47 AM |
|
Building a bigger, better anthill now that the weather is getting warm and I cant fit anything else on my limited apartment circuits. You can see a before-and-after: went from a storage area in the back of an office to what will become a high-capacity rack. 2x L6-30 circuits (213V, 30A each) - Currently using an unmetered PDU with C13 outlets 1x L21-20 circuit (120V, 20A,20A,20A) - Currently using a metered PDU with L5-20 outlets 1x 5-20 circuit with duplex outlet approximately 15kW of power available under 80% rule of thumb, with about 4kW of equipment once I move a few more things in, a bunch more antminers showing up thursday, and leaving lots of room to grow. Not sure what I will hit first - power limits or cooling limits (industrial 600V A/C) http://i.share.pho.to/3e4513d5_o.jpeghttp://i.share.pho.to/74a41e01_o.jpegThere is a 1200W Corsair PSU, plus 3x 835W server power supplies wired up and ready to go. All of them will use 213V power for a bit better efficiency What is the hardware used there?
|
|
|
|
crazyates
Legendary
Offline
Activity: 952
Merit: 1000
|
|
March 18, 2014, 01:11:27 PM |
|
I posted elsewhere, but I forgot to post here: This is our farm in it's current status. Most of those shelves are GPUs, but the bottom row has been designated for Ants. You can see the 2 PSUs we have powering all 8 Ants. We have more Ants in another room, but those didn't fit. Total draw: 71.5A @ 208v. 27MH/s + 2000GH/s. Future plans are to increase hashrate, while increasing efficiency and staying at the same power usage.
|
|
|
|
klondike_bar
Legendary
Offline
Activity: 2128
Merit: 1005
ASIC Wannabe
|
|
March 18, 2014, 02:31:06 PM |
|
Building a bigger, better anthill now that the weather is getting warm and I cant fit anything else on my limited apartment circuits. You can see a before-and-after: went from a storage area in the back of an office to what will become a high-capacity rack. 2x L6-30 circuits (213V, 30A each) - Currently using an unmetered PDU with C13 outlets 1x L21-20 circuit (120V, 20A,20A,20A) - Currently using a metered PDU with L5-20 outlets 1x 5-20 circuit with duplex outlet approximately 15kW of power available under 80% rule of thumb, with about 4kW of equipment once I move a few more things in, a bunch more antminers showing up thursday, and leaving lots of room to grow. Not sure what I will hit first - power limits or cooling limits (industrial 600V A/C) There is a 1200W Corsair PSU, plus 3x 835W server power supplies wired up and ready to go. All of them will use 213V power for a bit better efficiency What is the hardware used there? Right now, just 4 antminers (2 per crate, sitting atop a third empty crate), just to the left of the shelving. I have 8 more antminers going in on wednesday/thursday, and a Batch 2 S2 ordered for april 10
|
|
|
|
1l1l11ll1l
Legendary
Offline
Activity: 1274
Merit: 1000
|
|
March 19, 2014, 12:34:14 AM |
|
|
|
|
|
jjiimm_64
Legendary
Offline
Activity: 1876
Merit: 1000
|
|
March 19, 2014, 01:03:42 AM |
|
|
1jimbitm6hAKTjKX4qurCNQubbnk2YsFw
|
|
|
leoragraves666
|
|
March 19, 2014, 01:47:18 PM |
|
1100w, 34MH, 95 gridseeds with two PCs controlling everything.
Any troubles with temperature here? Do they generate a lot of heat? I am asking because I am expecting 300 of those and I am thinking if i have to install air-conditioning too?
|
PC & Mac repairs
|
|
|
atomicchaos
|
|
March 19, 2014, 02:07:51 PM |
|
I've posted the setup before, but have updated some things, and currently getting ready for doubling capacity with power and cooling upgrades, so there will be even more racks soon. Also moving all the rigs out of my house and back into the space now that winter is winding down slightly. Rack #1: Rack #2 (minus the rigs at my house for heating): Command and Control - Bitcoinwisdom graphs, CGremote, OpenNMS (PDU amp and temperature monitoring/graphing), and an IP camera of my warehouse space: My hash rate, which used to be top 5 on wemineltc, but now has dropped to top 20 and dwindling: Semi-related toys:
|
BTC:113mFe2e3oRkZQ5GeqKhoHbGtVw16unnw2
|
|
|
crazyates
Legendary
Offline
Activity: 952
Merit: 1000
|
|
March 19, 2014, 02:20:27 PM |
|
I've posted the setup before, but have updated some things, and currently getting ready for doubling capacity with power and cooling upgrades, so there will be even more racks soon. Also moving all the rigs out of my house and back into the space now that winter is winding down slightly. Rack #1: [img ]http://i1346.photobucket.com/albums/p685/atomicchaos1/DSC_4661_zpsbcc1eef9.jpg[/img] Rack #2 (minus the rigs at my house for heating): [img ]http://i1346.photobucket.com/albums/p685/atomicchaos1/DSC_4660_zps56eb2028.jpg[/img] Command and Control - Bitcoinwisdom graphs, CGremote, OpenNMS (PDU amp and temperature monitoring/graphing), and an IP camera of my warehouse space: [img ]http://i1346.photobucket.com/albums/p685/atomicchaos1/DSC_4692_zpsbe2a5190.jpg[/img] My hash rate, which used to be top 5 on wemineltc, but now has dropped to top 20 and dwindling: Semi-related toys: [img ]http://i1346.photobucket.com/albums/p685/atomicchaos1/DSC_4665_zpse86eee1b.jpg[/img] [img ]http://i1346.photobucket.com/albums/p685/atomicchaos1/DSC_4671_zps97720b03.jpg[/img] Nice rigs! I esp like the monitoring station. You're probably running somewhere around 42kW?
|
|
|
|
atomicchaos
|
|
March 19, 2014, 02:30:45 PM |
|
Nice rigs! I esp like the monitoring station. You're probably running somewhere around 42kW?
Thanks! Yes, its pretty close to 42 kW, when factoring in both sites (the ones heating my house, and the warehouse). Electrician is currently installing a new 400 amp subpanel and have a new AC unit arriving today. Additionally, I'm brainstorming on a cooling solution that would enclose the front of the racks in order to exhaust the hot air better, and thereby cool the space more efficiently. Mining is slowing down on profitability quite a bit, but that also means cheap graphic cards coming. I have some orders for ASICs to attempt to stay in the arms race for 6-12 months, we'll see if it pans out. 300 mh/s is the new 100 mh/s. Only advantage I have is a paid off farm and cheap power.
|
BTC:113mFe2e3oRkZQ5GeqKhoHbGtVw16unnw2
|
|
|
valkir
Legendary
Offline
Activity: 1484
Merit: 1004
|
|
March 19, 2014, 03:08:36 PM |
|
Wow that is a BIG motherf...er farm! Nice job atomic! I wish I was older and can build this. What are you doing in life to be able to paid for all this stuff?? Keep the good work!
|
██ Please support sidehack with his new miner project Send to :
1BURGERAXHH6Yi6LRybRJK7ybEm5m5HwTr
|
|
|
sudoku
|
|
March 19, 2014, 03:12:25 PM |
|
So how much are you paying for electricity?
|
1SudokuNgdzsYuANDinxUBwKgfyv5cptW
|
|
|
jsgayo
|
|
March 19, 2014, 03:18:25 PM |
|
here is my 2*5970 setup with open-air cool
|
|
|
|
S4VV4S
|
|
March 19, 2014, 03:33:09 PM |
|
here is my 2*5970 setup with open-air cool
Where?
|
|
|
|
seriouscoin
|
|
March 19, 2014, 04:12:54 PM |
|
here is my 2*5970 setup with open-air cool
Where? Just imagine it man.
|
|
|
|
rmines
|
|
March 19, 2014, 04:42:51 PM |
|
This thread is about posting pictures, there's no use of telling what rig you own without posting pictures.
|
|
|
|
S4VV4S
|
|
March 19, 2014, 04:44:36 PM |
|
here is my 2*5970 setup with open-air cool
Where? Just imagine it man. I am. It is quite good. But not as good as my 7PH data center here:
|
|
|
|
|