Bitcoin Forum
June 25, 2025, 05:23:53 PM *
News: Pizza day contest voting
 
   Home   Help Search Login Register More  

Warning: Moderators do not remove likely scams. You must use your own brain: caveat emptor. Watch out for Ponzi schemes. Do not invest more than you can afford to lose.

Warning: One or more bitcointalk.org users have reported that they strongly believe that the creator of this topic is a scammer. (Login to see the detailed trust ratings.) While the bitcointalk.org administration does not verify such claims, you should proceed with extreme caution.
Pages: « 1 ... 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166 1167 1168 1169 1170 1171 1172 1173 1174 1175 1176 1177 1178 1179 1180 1181 1182 1183 1184 1185 1186 1187 1188 1189 1190 1191 1192 1193 1194 1195 1196 1197 1198 1199 [1200] 1201 1202 1203 1204 1205 1206 1207 1208 1209 1210 1211 1212 1213 1214 1215 1216 1217 1218 1219 1220 1221 1222 1223 1224 1225 1226 1227 1228 1229 1230 1231 1232 1233 1234 1235 1236 1237 1238 1239 1240 1241 1242 1243 1244 1245 1246 1247 1248 1249 1250 ... 1348 »
  Print  
Author Topic: ASICMINER: Entering the Future of ASIC Mining by Inventing It  (Read 3918232 times)
Chris_Sabian
Legendary
*
Offline Offline

Activity: 896
Merit: 1001



View Profile
October 24, 2014, 04:07:48 PM
 #23981

and havelock crashes.

Of course.  That happens alot though unfortunately.  I just hope that they don't pull a MtGox
hdbuck
Legendary
*
Offline Offline

Activity: 1260
Merit: 1002



View Profile
October 24, 2014, 04:10:31 PM
 #23982

Sorry folks,

FC talks and we crash  Huh

Working to bring it back up...

Lmfao Cheesy
whalezy
Member
**
Offline Offline

Activity: 103
Merit: 10


View Profile
October 24, 2014, 04:18:55 PM
 #23983

Crash on a 200 shares buy??  Huh

Exactly the opposition I think.
friedcat (OP)
Donator
Legendary
*
Offline Offline

Activity: 848
Merit: 1005



View Profile
October 24, 2014, 04:19:32 PM
 #23984

Development
The 28nm BE300 engineering batch tapeout was in September 16 with TSMC.
The power efficiency is 0.225W/G to 0.343W/G ranging from core voltage of 0.55V
to 0.70V.

Huh, interesting: Initially the low-power-mode of gen 3 (BE200) was supposed to be <0.2W/GHs, now the planned efficiency is only 0.225W/GHs with the BE300s... How come?
When will the first physical chips be tested, when will we get to know if the power consumption is fine?

Thanks a lot for the update, friedcat!
BE200 was supposed to be <0.2W/GHs because we planned that it has some large room of downvoltage. However most room was
eaten by the mistake we made in chip and package design.

For BE300 in theory it is possible to get lower than 0.225W/GH by stressing the voltage down below 0.55V, but we do not have
solid simulation data yet, so let's see after the test chips are out.

December 16 is to be expected for us to get the chips. Testing time varies at 3-10 days since we had much more preparation work already done this time.

ujka
Hero Member
*****
Offline Offline

Activity: 630
Merit: 500


View Profile
October 24, 2014, 04:23:46 PM
 #23985

Thanks on update. BE300 seems like it's coming as planned.
rudi
Full Member
***
Offline Offline

Activity: 141
Merit: 100


View Profile
October 24, 2014, 04:26:19 PM
 #23986

Friedcat: Thanks very much for the update, and congratulations for the good work.
FUR11
Sr. Member
****
Offline Offline

Activity: 378
Merit: 250

FURring bitcoin up since 1762


View Profile
October 24, 2014, 04:29:39 PM
 #23987

December 16 is to be expected for us to get the chips. Testing time varies at 3-10 days since we had much more preparation work already done this time.

Alright, great! Please let us know immediately as soon as the initial and most important tests are concluded!!!

Blazed
Casascius Addict
Legendary
*
Offline Offline

Activity: 2128
Merit: 1119



View Profile WWW
October 24, 2014, 04:40:43 PM
 #23988

Wow Havelock sucks...down again. Any chance of moving AM to something more reliable? Any thoughts on some type of non centralized platform (counterparty/ colored coins / etc...)?
jdany
Hero Member
*****
Offline Offline

Activity: 644
Merit: 500


Inspired


View Profile
October 24, 2014, 04:41:26 PM
 #23989

FC -

Your candor is appreciated.
When will we get a glimpse of the closing quarter's financials?

Can we get an idea what self mining looks like right now?


whalezy
Member
**
Offline Offline

Activity: 103
Merit: 10


View Profile
October 24, 2014, 04:44:56 PM
 #23990

Update

Development
The 28nm BE300 engineering batch tapeout was in September 16 with TSMC.
The power efficiency is 0.225W/G to 0.343W/G ranging from core voltage of 0.55V
to 0.70V. The two main mistakes made in BE200 were dedicatedly addressed and
avoided in the whole design stage so we do not expect surprise in frequency and
power consumption in real products.

14nm/16nm projects are at pre-evaluation and pre-design stage. It has to be done
in 2015 but the starting time of placing orders depends on overall gain vs (NRE/R&D/risks).

Led by Block Erupter Prisma, a series of efforts to reduce component-wise
cost and system-wise power efficiency were made.

Production
As known by OEM producers, several large batches of BE200 had problems with
popping chips affecting whole boards due to the misoperation from the packaging
company. It hindered afterwards chip sales and delayed the starting time of
Tube/Prisma sales. Later supply of BE200 has no such problem and filtering process
on old BE200 is also underway.

Because of the non-open-source status of Prisma and high cost of all other designs, BE200
sales were stopped. Rest BE200 chips will likely be consumed by Prisma and succeeding revises.

The mass production time of BE300 in terms of chip-out date is February to March, 2015.

Operation
As sales were seriously hindered by unexpected yield issue of BE200, we had missed many
dates with financing the big mining farm of our own. It is still hopeful that all good BE200
will be turned to hashrate before too late and we have liquid profits again before BE300, but
from the big picture, the missing of target on BE200, the mis-judgment on OEMs and later
yield/financing problem, limited our expansion and profit in this year. But luckily R&D on later
products is not much affected.

AM will continue to develop new products, expand its mining farms, deliver machines to miners,
as well as make money for shareholders.

There is no any foreseeable plan from AM side on force buy-back, dumping, or any
activities on the open stock market. There is no plan of privatization either. The management,
R&D, sales as well as marketing is being more and more separated and dedicated to professionals,
but the founders will continue to be heavily involved and drive AM in the more and more competitive
market. Scenarios of BE100 vs graphics card may never happen again, but we need catch
any opportunity on timing window of leads at either technology or deploying/financing resources
to win the last battle when mining is still an under-capitalized game.


Any way, thanks, FC. Although I lost a lot of money on AM shares, I'm glad to hear departments of AM is aiming to be more separated and professional. Packaging problem is obvious due to the absence of quality management system. If AM sent engineer to package factory, this failure would be avoided.
elasticband
Legendary
*
Offline Offline

Activity: 1036
Merit: 1000


Nighty Night Don't Let The Trolls Bite Nom Nom Nom


View Profile
October 24, 2014, 05:03:39 PM
 #23991



Update

Development
The 28nm BE300 engineering batch tapeout was in September 16 with TSMC.
The power efficiency is 0.225W/G to 0.343W/G ranging from core voltage of 0.55V
to 0.70V. The two main mistakes made in BE200 were dedicatedly addressed and
avoided in the whole design stage so we do not expect surprise in frequency and
power consumption in real products.

14nm/16nm projects are at pre-evaluation and pre-design stage. It has to be done
in 2015 but the starting time of placing orders depends on overall gain vs (NRE/R&D/risks).

Led by Block Erupter Prisma, a series of efforts to reduce component-wise
cost and system-wise power efficiency were made.

Production
As known by OEM producers, several large batches of BE200 had problems with
popping chips affecting whole boards due to the misoperation from the packaging
company. It hindered afterwards chip sales and delayed the starting time of
Tube/Prisma sales. Later supply of BE200 has no such problem and filtering process
on old BE200 is also underway.

Because of the non-open-source status of Prisma and high cost of all other designs, BE200
sales were stopped. Rest BE200 chips will likely be consumed by Prisma and succeeding revises.

The mass production time of BE300 in terms of chip-out date is February to March, 2015.

Operation
As sales were seriously hindered by unexpected yield issue of BE200, we had missed many
dates with financing the big mining farm of our own. It is still hopeful that all good BE200
will be turned to hashrate before too late and we have liquid profits again before BE300, but
from the big picture, the missing of target on BE200, the mis-judgment on OEMs and later
yield/financing problem, limited our expansion and profit in this year. But luckily R&D on later
products is not much affected.

AM will continue to develop new products, expand its mining farms, deliver machines to miners,
as well as make money for shareholders.

There is no any foreseeable plan from AM side on force buy-back, dumping, or any
activities on the open stock market. There is no plan of privatization either. The management,
R&D, sales as well as marketing is being more and more separated and dedicated to professionals,
but the founders will continue to be heavily involved and drive AM in the more and more competitive
market. Scenarios of BE100 vs graphics card may never happen again, but we need catch
any opportunity on timing window of leads at either technology or deploying/financing resources
to win the last battle when mining is still an under-capitalized game.

elasticband
Legendary
*
Offline Offline

Activity: 1036
Merit: 1000


Nighty Night Don't Let The Trolls Bite Nom Nom Nom


View Profile
October 24, 2014, 05:15:31 PM
 #23992

BE200 was supposed to be <0.2W/GHs because we planned that it has some large room of downvoltage. However most room was
eaten by the mistake we made in chip and package design.

For BE300 in theory it is possible to get lower than 0.225W/GH by stressing the voltage down below 0.55V, but we do not have
solid simulation data yet, so let's see after the test chips are out.

December 16 is to be expected for us to get the chips. Testing time varies at 3-10 days since we had much more preparation work already done this time.

This will be the most important 2 weeks in AM history. Great work getting us this far and keeping us on track for the future!
MilkyLep
Hero Member
*****
Offline Offline

Activity: 583
Merit: 500


Bitcoin for all & all for Bitcoin


View Profile
October 24, 2014, 05:26:47 PM
 #23993

friedcat do you feel the BE300 is already highly optimized (minus futher undervolting tests) enough to not make revisions to the chip/package etc itself?

Would you also be able to elaborate more on the operations side relating to DataTank or even AMHASH?

Any chance of an estimated date for financials?

Either you own the bitcoins(private keys) or you don't. However with moneroj, nobody knows what you own.
Secure. Private. Untraceable.
Bonam
Sr. Member
****
Offline Offline

Activity: 420
Merit: 250


View Profile
October 24, 2014, 05:45:36 PM
 #23994

Definitely nice to see an update from FC. Reading between the lines, it seems that dividends are unlikely until Spring 2015, contingent on gen 4 being profitable.

The post clearly states that there are no "liquid profits" presently due to the gen 3 issues, and that there is only a "hope" that BE200s might be put to use mining profitably before that.
jimmothy
Hero Member
*****
Offline Offline

Activity: 770
Merit: 509



View Profile
October 24, 2014, 07:52:13 PM
 #23995



Anyone know what these are? Giant miners?
novusordo
Sr. Member
****
Offline Offline

Activity: 800
Merit: 250



View Profile
October 24, 2014, 07:59:12 PM
 #23996



Anyone know what these are? Giant miners?



"Enhance!"


                            █████
                        █████████████
                     █████████████
                 ██████████████        █████
              █████████████        ████████████
          ██████████████        █████████████
       █████████████        █████████████       ██████
       ██████████        ████████████           ██████
       ███████       █████████████       ███    ██████
       ███████    █████████████       ██████    ██████
       ████████████████████       ██████████    ██████
       █████████████████       █████████████    ██████
       █████████████       █████████████        ██████
       ██████████       █████████████           ██████
       ███████      ██████████████       ███    ██████
       ██████    █████████████       ███████    ██████
       ██████    ██████████       ██████████    ██████
       ██████    ██████        █████████████    ██████
       ██████    ███       █████████████        ██████
       ██████           █████████████       ██████████
       ██████       █████████████        █████████████
                 █████████████       █████████████
              ████████████        █████████████
                  ████         ████████████
                           █████████████
                         ███████████
                            █████
Ferrum Network • Interoperability Network for Financial Applications
nycgoat
Member
**
Offline Offline

Activity: 117
Merit: 10


View Profile
October 24, 2014, 08:00:56 PM
 #23997



Anyone know what these are? Giant miners?

Potentially immersion cooling.  I saw these and a bunch of other pictures on Instagram today.

http://instagram.com/asicminerhash/
teek
Hero Member
*****
Offline Offline

Activity: 667
Merit: 500



View Profile
October 24, 2014, 08:10:10 PM
 #23998

i think its compressor based cooling of some kind..  kinda like industrial style portable a/c?     def not immersion cooling as someone stated.
hdbuck
Legendary
*
Offline Offline

Activity: 1260
Merit: 1002



View Profile
October 24, 2014, 08:29:15 PM
 #23999

friedcat do you feel the BE300 is already highly optimized (minus futher undervolting tests) enough to not make revisions to the chip/package etc itself?

Would you also be able to elaborate more on the operations side relating to DataTank or even AMHASH?

Any chance of an estimated date for financials?

Chris_Sabian
Legendary
*
Offline Offline

Activity: 896
Merit: 1001



View Profile
October 24, 2014, 08:39:19 PM
 #24000

Definitely nice to see an update from FC. Reading between the lines, it seems that dividends are unlikely until Spring 2015, contingent on gen 4 being profitable.

The post clearly states that there are no "liquid profits" presently due to the gen 3 issues, and that there is only a "hope" that BE200s might be put to use mining profitably before that.

I would tend to agree with that statement.  I sounds like all of the money is being used to fund gen4
Pages: « 1 ... 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166 1167 1168 1169 1170 1171 1172 1173 1174 1175 1176 1177 1178 1179 1180 1181 1182 1183 1184 1185 1186 1187 1188 1189 1190 1191 1192 1193 1194 1195 1196 1197 1198 1199 [1200] 1201 1202 1203 1204 1205 1206 1207 1208 1209 1210 1211 1212 1213 1214 1215 1216 1217 1218 1219 1220 1221 1222 1223 1224 1225 1226 1227 1228 1229 1230 1231 1232 1233 1234 1235 1236 1237 1238 1239 1240 1241 1242 1243 1244 1245 1246 1247 1248 1249 1250 ... 1348 »
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!