Paladin69
|
|
July 02, 2013, 08:09:21 PM |
|
If that is all it is, just 24 hours and actually means "days"...then no big deal. I thought maybe it was large groups that wait for many weeks in between.
I never considered that... stop it, lol Someone needs to ask that Q to clarify! "How many days between shipping day 1, and shipping day 2?" Just e-mailed sales. I'll post when I get a reply.
|
|
|
|
Phoenix1969
Legendary
Offline
Activity: 938
Merit: 1000
LIR DEV
|
|
July 02, 2013, 08:11:18 PM |
|
thx '69er... will be waiting on edge of seat...
|
|
|
|
afro25
|
|
July 02, 2013, 08:13:07 PM |
|
Ordered a Mercury... Order # 31xx... Fuuuuuuuu!!!!! So I'm guessing this means there's probably a minimum of 600 th/s worth of orders in front of me? I hope I've worked that out wrong
|
|
|
|
Phoenix1969
Legendary
Offline
Activity: 938
Merit: 1000
LIR DEV
|
|
July 02, 2013, 08:15:04 PM |
|
Ordered a Mercury... Order # 31xx... Fuuuuuuuu!!!!! So I'm guessing this means there's probably a minimum of 600 th/s worth of orders in front of me? I hope I've worked that out wrong
order # does not mean PAID order #... its much lower the actual # of paid orders
|
|
|
|
adrd
Newbie
Offline
Activity: 39
Merit: 0
|
|
July 02, 2013, 08:16:30 PM |
|
Ordered a Mercury... Order # 31xx... Fuuuuuuuu!!!!! So I'm guessing this means there's probably a minimum of 600 th/s worth of orders in front of me? I hope I've worked that out wrong
order # does not mean PAID order #... its much lower the actual # of paid orders +1, probably at leat 50% of orders are cancelled or not paid
|
|
|
|
docjunior
Member
Offline
Activity: 62
Merit: 10
|
|
July 02, 2013, 08:26:40 PM |
|
Order in the late 800's, Day 2.
|
|
|
|
DPoS
|
|
July 02, 2013, 08:31:10 PM |
|
yeah let's not forget the pre-order placement is more important than these order numbers.
I had a low pre-order spot
I guess if KnC went the extra mile they could of listed everyone's preorder spot along with their order# and their day1, day2 etc
then it would make it easier for everyone to digest
|
|
|
|
Paladin69
|
|
July 02, 2013, 08:41:49 PM |
|
Ordered a Mercury... Order # 31xx... Fuuuuuuuu!!!!! So I'm guessing this means there's probably a minimum of 600 th/s worth of orders in front of me? I hope I've worked that out wrong
Yep, ASICMiner is in front of you. They will resell you shares @ 1000% markup so they can buy more KnC for themselves.
|
|
|
|
canth
Legendary
Offline
Activity: 1442
Merit: 1001
|
|
July 02, 2013, 08:44:48 PM |
|
Ordered a Mercury... Order # 31xx... Fuuuuuuuu!!!!! So I'm guessing this means there's probably a minimum of 600 th/s worth of orders in front of me? I hope I've worked that out wrong
Yep, ASICMiner is in front of you. They will resell you shares @ 1000% markup so they can buy more KnC for themselves. Uggh. Really, more of this crap? As far as I know, Bitfountain (the owners of ASICMiner) hasn't sold a single share since they IPOed at .1 BTC/share, back in September 2012.
|
|
|
|
blastbob
|
|
July 02, 2013, 08:46:28 PM |
|
Just give me the chip info and some teasing pictures!
|
Bitrated user: blastbob.
|
|
|
adrd
Newbie
Offline
Activity: 39
Merit: 0
|
|
July 02, 2013, 09:01:17 PM |
|
|
|
|
|
blastbob
|
|
July 02, 2013, 09:02:14 PM |
|
hahahahahah. I need to watch my words from now on..
|
Bitrated user: blastbob.
|
|
|
erk
|
|
July 02, 2013, 09:30:54 PM Last edit: July 02, 2013, 10:12:37 PM by erk |
|
No one should be ordering at this point, period.
They need $3.5mill in pre-orders to fund the chip run, similar to the once off funding issues BFL had for the first wafer run. My main concern is the 250watts of each chip. I don't know of any chip with that much power consumption, it will need fans like a whole GPU card and more. The package will need a massive TDP rating. eg. a Pentium 4 Extreme Edition, one of the most power consuming CPU's of all time, was about half that rating. I won't be ordering until these things are out in the field and proven. I am not a lab rat.
|
|
|
|
OmegaNemesis28
|
|
July 02, 2013, 09:37:16 PM |
|
Anyone order a mercury and get a day yet on their order checkup?
|
|
|
|
Phoenix1969
Legendary
Offline
Activity: 938
Merit: 1000
LIR DEV
|
|
July 02, 2013, 09:41:40 PM |
|
No one should be ordering at this point, period.
They need $3.5mill in pre-orders to fund the chip run, similar to the once off funding issues BFL had for the first wafer run. My main concern is the 250watts of each chip. I don't know of any chip with that much power consumption, it will need fans like a whole GPU card and more. The package will need a massive TDP rating. I won't be ordering until these things are out in the field and proven. I am not a lab rat. My 7970 is 28nm, and draws more than that.... hahaha
|
|
|
|
Phoenix1969
Legendary
Offline
Activity: 938
Merit: 1000
LIR DEV
|
|
July 02, 2013, 09:42:25 PM |
|
Anyone order a mercury and get a day yet on their order checkup?
Dude, it's like midnight in Sweden, it will take a day or two for them to add that comment to your order, lol
|
|
|
|
Phoenix1969
Legendary
Offline
Activity: 938
Merit: 1000
LIR DEV
|
|
July 02, 2013, 10:18:45 PM |
|
Paladin69..... I just noticed something.... Reading a bit more slowly now...... "This unit has been scheduled for shipping on day 2 of production" Day two of production, not shipping day two....weeeeeeeee
|
|
|
|
erk
|
|
July 02, 2013, 10:34:01 PM Last edit: July 02, 2013, 11:12:19 PM by erk |
|
No one should be ordering at this point, period.
They need $3.5mill in pre-orders to fund the chip run, similar to the once off funding issues BFL had for the first wafer run. My main concern is the 250watts of each chip. I don't know of any chip with that much power consumption, it will need fans like a whole GPU card and more. The package will need a massive TDP rating. I won't be ordering until these things are out in the field and proven. I am not a lab rat. My 7970 is 28nm, and draws more than that.... hahaha That's a whole card with countless components, not one chip, and video cards have like 3 fans and massive heatsinks! A big chunk of the 7970 power consumption are the components on the back of the board and the 3GB GDDR5 Memory.
|
|
|
|
Phoenix1969
Legendary
Offline
Activity: 938
Merit: 1000
LIR DEV
|
|
July 02, 2013, 10:39:46 PM |
|
No one should be ordering at this point, period.
They need $3.5mill in pre-orders to fund the chip run, similar to the once off funding issues BFL had for the first wafer run. My main concern is the 250watts of each chip. I don't know of any chip with that much power consumption, it will need fans like a whole GPU card and more. The package will need a massive TDP rating. I won't be ordering until these things are out in the field and proven. I am not a lab rat. My 7970 is 28nm, and draws more than that.... hahaha That's a whole card with countless components, not one chip, and video cards have like 3 fans and massive heatsinks! Your point is?... and the machines in Question are much bigger than Graphics cards, aren't they? You have doubts... you should post them elsewhere..... and go buy a BFL product, from a convicted Mail fraud Felon.
|
|
|
|
erk
|
|
July 02, 2013, 10:41:59 PM |
|
No one should be ordering at this point, period.
They need $3.5mill in pre-orders to fund the chip run, similar to the once off funding issues BFL had for the first wafer run. My main concern is the 250watts of each chip. I don't know of any chip with that much power consumption, it will need fans like a whole GPU card and more. The package will need a massive TDP rating. I won't be ordering until these things are out in the field and proven. I am not a lab rat. My 7970 is 28nm, and draws more than that.... hahaha That's a whole card with countless components, not one chip, and video cards have like 3 fans and massive heatsinks! Your point is?... and the machines in Question are much bigger than Graphics cards, aren't they? You have doubts... you should post them elsewhere..... and go buy a BFL product, from a convicted Mail fraud Felon. It's pretty obvious you don't have an electronics design formal education, I do.
|
|
|
|
|