Pages: « 1 ... 1528 1529 1530 1531 1532 1533 1534 1535 1536 1537 1538 1539 1540 1541 1542 1543 1544 1545 1546 1547 1548 1549 1550 1551 1552 1553 1554 1555 1556 1557 1558 1559 1560 1561 1562 1563 1564 1565 1566 1567 1568 1569 1570 1571 1572 1573 1574 1575 1576 1577 [1578] 1579 1580 1581 1582 1583 1584 1585 1586 1587 1588 1589 1590 1591 1592 1593 1594 1595 1596 1597 1598 1599 1600 1601 1602 1603 1604 1605 1606 1607 1608 1609 1610 1611 1612 1613 1614 1615 1616 1617 1618 1619 1620 1621 1622 1623 1624 1625 1626 1627 1628 ... 2137 »
  Print  
Author Topic: Swedish ASIC miner company kncminer.com  (Read 3049511 times)
-ck
Legendary
*
Offline Offline

Activity: 4284
Merit: 1645


Ruu \o/


View Profile WWW
March 31, 2014, 10:01:56 AM
 #31541

but but...there was some network protection statement about KNC and their mining operations.)
See with their new found logic they're protecting the network by increasing the overall hashrate.

Developer/maintainer for cgminer, ckpool/ckproxy, and the -ck kernel
2% Fee Solo mining at solo.ckpool.org
-ck
smoothrunnings
Hero Member
*****
Offline Offline

Activity: 630
Merit: 501


View Profile
March 31, 2014, 10:09:57 AM
 #31542

Have you every bought co-location space in your life to store your own servers? They charge you per-circuit and not for the power you use. There is at least one state in the US that has the lowest power costs out of all the other states that would be a good place for setting up cloud mining sites. There was a story recently on YouTube of a guy who setup his own mining in this state; which they wouldn't name; in a co-location, he was making 8 million a week in Bitcoin mining and was using 1mw of power. (Yes..Mega Watt)

That's funny, because I was going to ask you the same thing.  They don't care about power as they usually give you a set amount of power depend on the amount of rack spaces you are leasing:  typically 20-amp 220-V for a full 42U rack, with only 16-amp usable = 3.3kW, enough to power a whopping one 3TH miner.  You can't plug any more equipment in the rack and power it from the same circuit as it will overload and trip the circuit breaker.  You will have to pay additional fee to get more power in, typically at least $200+ per additional 20-amp circuit and that's without any A+B redundancy power feeds.  That's right for power redundancy, you will have to pay another $200 for 20-AMP of standby power that you cannot use.  Otherwise if one of your circuit went out even for just a split second (due to power failure/UPS/breaker), you will now be running twice the power on the second circuit thus tripping the breaker on that circuit and all your equipment is shut down...  How do I know?  I was responsible for relocating all of my last company's servers from the various offices into a colocation with redundant power feeds from the power company, backup diesel generators, redundant climate control, redundant data circuit, secure access, etc..  I shopped around extensively and it is not cheap.  My current employer has almost 1000 servers at their off-site data center and they spent several millions per years in data center costs.  That's not even counting the salary of the staffs necessary to support such a large DC operations.

Sounds like your employer needs to switch to a virtualize solution so they don't have a 1000 physical servers spending millions and also start running their equipment at 200 volts to reduce their amperage, not to mention 200V is cleaner than 120V.

We are completely virtualized at work with about 500 servers cross 3 data centers, about 5 physical servers and a petabyte EqualLogic SAN.

 
smoothrunnings
Hero Member
*****
Offline Offline

Activity: 630
Merit: 501


View Profile
March 31, 2014, 10:12:57 AM
 #31543

Have you every bought co-location space in your life to store your own servers? They charge you per-circuit and not for the power you use. There is at least one state in the US that has the lowest power costs out of all the other states that would be a good place for setting up cloud mining sites. There was a story recently on YouTube of a guy who setup his own mining in this state; which they wouldn't name; in a co-location, he was making 8 million a week in Bitcoin mining and was using 1mw of power. (Yes..Mega Watt)

Have you?

They charge you for:

1. Amount of rack space
2. Data (fixed or 95th percentile)
3. Power (per Amp)




Yes.

#2. 90 ~ 95 percentile
#3. Is a flat rate per circuit, it's not if only only use 3Amp of your 20Amp 220v circuit you are billed for that. However if you shop around you can get the circuit cheaper at one colo's.

Xialla
Legendary
*
Offline Offline

Activity: 1036
Merit: 1001


/dev/null


View Profile
March 31, 2014, 10:16:13 AM
 #31544

but but...there was some network protection statement about KNC and their mining operations.)
See with their new found logic they're protecting the network by increasing the overall hashrate.

hm, I expected that they are just open source enthusiast and they are doing just pure greedy business funded by free loans (customer preorders)

I'm going to vomit
xstr8guy
Hero Member
*****
Offline Offline

Activity: 784
Merit: 1004


Glow Stick Dance!


View Profile
March 31, 2014, 12:34:48 PM
 #31545

To lazy to link it but I just read a post in Mining Speculation that 20nm will be delayed until the end of 2014.
jelin1984
Legendary
*
Offline Offline

Activity: 2408
Merit: 1004



View Profile
March 31, 2014, 12:38:42 PM
 #31546

Where do you read these any link?
pedrosoft
Hero Member
*****
Offline Offline

Activity: 560
Merit: 500



View Profile
March 31, 2014, 12:40:32 PM
 #31547

Hi all,
any possibilty to have refund in Btc for 1 Neptune ?
jelin1984
Legendary
*
Offline Offline

Activity: 2408
Merit: 1004



View Profile
March 31, 2014, 12:41:57 PM
 #31548

No only at dollars is better now at dollars I think

You will buy more btc coin with dollars refund
pedrosoft
Hero Member
*****
Offline Offline

Activity: 560
Merit: 500



View Profile
March 31, 2014, 12:44:30 PM
 #31549

No only at dollars is better now at dollars I think

You will buy more btc coin with dollars refund

... refund in BTC equivalent Smiley
lemonte
Hero Member
*****
Offline Offline

Activity: 624
Merit: 502


View Profile
March 31, 2014, 12:48:56 PM
 #31550

To lazy to link it but I just read a post in Mining Speculation that 20nm will be delayed until the end of 2014.

Just seen it now! Do you think it's real?

raskul
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
March 31, 2014, 12:51:02 PM
 #31551

To lazy to link it but I just read a post in Mining Speculation that 20nm will be delayed until the end of 2014.

Just seen it now! Do you think it's real?

my sources were real enough.
ADD: sorry if it causes any frustrations - i'm just a journo.

tips    1APp826DqjJBdsAeqpEstx6Q8hD4urac8a
lemonte
Hero Member
*****
Offline Offline

Activity: 624
Merit: 502


View Profile
March 31, 2014, 12:51:33 PM
 #31552

To lazy to link it but I just read a post in Mining Speculation that 20nm will be delayed until the end of 2014.

Just seen it now! Do you think it's real?

my sources were real enough.

Do you care to share who/where the information came from?

raskul
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
March 31, 2014, 12:52:28 PM
 #31553

To lazy to link it but I just read a post in Mining Speculation that 20nm will be delayed until the end of 2014.

Just seen it now! Do you think it's real?

my sources were real enough.

Do you care to share who/where the information came from?

no sorry. their job would be at risk.

tips    1APp826DqjJBdsAeqpEstx6Q8hD4urac8a
lemonte
Hero Member
*****
Offline Offline

Activity: 624
Merit: 502


View Profile
March 31, 2014, 12:53:53 PM
 #31554

To lazy to link it but I just read a post in Mining Speculation that 20nm will be delayed until the end of 2014.

Just seen it now! Do you think it's real?

my sources were real enough.

Do you care to share who/where the information came from?

no sorry. their job would be at risk.

No worries. I wonder when they will update everyone Sad
Surprised that no one has posted it on their forum yet.

faetos
Hero Member
*****
Offline Offline

Activity: 744
Merit: 514

gotta let a coin be a coin


View Profile
March 31, 2014, 12:55:35 PM
 #31555


 the link to the post about 20nm delays: https://bitcointalk.org/index.php?topic=551261.0
raskul
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
March 31, 2014, 12:58:29 PM
 #31556

To lazy to link it but I just read a post in Mining Speculation that 20nm will be delayed until the end of 2014.

Just seen it now! Do you think it's real?

my sources were real enough.

Do you care to share who/where the information came from?

no sorry. their job would be at risk.

No worries. I wonder when they will update everyone Sad
Surprised that no one has posted it on their forum yet.

I'm led to believe it was 'mentioned upon' and instantly deleted.  Undecided

tips    1APp826DqjJBdsAeqpEstx6Q8hD4urac8a
Biffa
Legendary
*
Offline Offline

Activity: 3234
Merit: 1220



View Profile
March 31, 2014, 01:08:16 PM
 #31557

Have you every bought co-location space in your life to store your own servers? They charge you per-circuit and not for the power you use. There is at least one state in the US that has the lowest power costs out of all the other states that would be a good place for setting up cloud mining sites. There was a story recently on YouTube of a guy who setup his own mining in this state; which they wouldn't name; in a co-location, he was making 8 million a week in Bitcoin mining and was using 1mw of power. (Yes..Mega Watt)

Have you?

They charge you for:

1. Amount of rack space
2. Data (fixed or 95th percentile)
3. Power (per Amp)




Yes.

#2. 90 ~ 95 percentile
#3. Is a flat rate per circuit, it's not if only only use 3Amp of your 20Amp 220v circuit you are billed for that. However if you shop around you can get the circuit cheaper at one colo's.



Its not in Europe, say everything else is equal you pay for a full rack with say 2TB bandwidth or 10Mb/s whatever you want. Then here you pay more depending how many amps you want in the rack. You can get anythign from 4 Amps to 32Amps per rack, although many limit you to 16 Amps.

Mine @ pools that pay Tx fees & don't mine empty blocks :: kanopool :: ckpool ::
Should bitmain create LPM for all models?
:: Dalcore's Crypto Mining H/W Hosting Directory & Reputation ::
lemonte
Hero Member
*****
Offline Offline

Activity: 624
Merit: 502


View Profile
March 31, 2014, 01:12:48 PM
 #31558

To lazy to link it but I just read a post in Mining Speculation that 20nm will be delayed until the end of 2014.

Just seen it now! Do you think it's real?

my sources were real enough.

Do you care to share who/where the information came from?

no sorry. their job would be at risk.

No worries. I wonder when they will update everyone Sad
Surprised that no one has posted it on their forum yet.

I'm led to believe it was 'mentioned upon' and instantly deleted.  Undecided

Damn! Sad

I'd have liked physical miners, but plan B is not that bad, at least I'll be saving on electricity prices I guess.

Searing
Copper Member
Legendary
*
Offline Offline

Activity: 2898
Merit: 1465


Clueless!


View Profile
March 31, 2014, 01:32:04 PM
 #31559

To lazy to link it but I just read a post in Mining Speculation that 20nm will be delayed until the end of 2014.

Just seen it now! Do you think it's real?

my sources were real enough.

Do you care to share who/where the information came from?

no sorry. their job would be at risk.

No worries. I wonder when they will update everyone Sad
Surprised that no one has posted it on their forum yet.

well that is interesting ...if the 20mm is that late due to probably chip mnfg issues (shades of BFL sitting on hands waiting for chip)....it would be 'tragic" if the 28mm Titan shipped first in that they (I think) could probably (I think) get the Titan out first

would make sense in they seem to be hyping that (to keep cash flow going) before annoucing a "hey guys you can virtual mine 3TH now for the rest of the year or wait for your equip? naw they'd prob still send the equip

anyway way BTC price is going down is it just me or with anticipated difficulty increase by the time we have even a virtual 3TH miner in our hand ..heck go 4Th...i gather you'd be able to buy more BTC at the current $450 price

this is a killer diff gonna go up next round prob 25% and BTC looks like it may go down 50%

"may you live in interesting times" "ancient Chinese curse

Searing

Old Style Legacy Plug & Play BBS System. Get it from www.synchro.net. Updated 1/1/2021. It also works with Windows 10 and likely 11 and allows 16 bit DOS game doors on the same Win 10 Machine in Multi-Node! Five Minute Install! Look it over it uninstalls just as fast, if you simply want to look it over. Freeware! Full BBS System! It is a frigging hoot!:)
el_rlee
Legendary
*
Offline Offline

Activity: 1600
Merit: 1014



View Profile
March 31, 2014, 01:36:45 PM
 #31560

Sorry for asking here, but couldn't find it... Are KnC miners running cgminer on OpenWRT? Does the interface look similar to the ones of Avalon and Antminer? Will the scrypt ASIC be similar probably?
Pages: « 1 ... 1528 1529 1530 1531 1532 1533 1534 1535 1536 1537 1538 1539 1540 1541 1542 1543 1544 1545 1546 1547 1548 1549 1550 1551 1552 1553 1554 1555 1556 1557 1558 1559 1560 1561 1562 1563 1564 1565 1566 1567 1568 1569 1570 1571 1572 1573 1574 1575 1576 1577 [1578] 1579 1580 1581 1582 1583 1584 1585 1586 1587 1588 1589 1590 1591 1592 1593 1594 1595 1596 1597 1598 1599 1600 1601 1602 1603 1604 1605 1606 1607 1608 1609 1610 1611 1612 1613 1614 1615 1616 1617 1618 1619 1620 1621 1622 1623 1624 1625 1626 1627 1628 ... 2137 »