Bitcoin Forum
April 25, 2024, 05:36:53 PM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: « 1 ... 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 [236] 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 ... 725 »
  Print  
Author Topic: [ANN] Spondoolies-Tech - carrier grade, data center ready mining rigs  (Read 1260002 times)
This is a self-moderated topic. If you do not want to be moderated by the person who started this topic, create a new topic.
Guy Corem (OP)
Donator
Legendary
*
Offline Offline

Activity: 1414
Merit: 1051


Spondoolies, Beam & DAGlabs


View Profile WWW
July 29, 2014, 09:34:17 PM
 #4701

Please correct me if I am wrong but you guys promised 6TH +/- 10% and 2500W Nominal Power Consumption?

We expected to get to 6 TH/s with 2700W "at the wall".
The issue with July, August and September batches is extremely slow (3 sigma slow) LVT transistors.
Fixing the issue is done by a small adjustment in the production process. No need to fix the masks.

Guy

New Mimblewimble implementation: https://www.beam.mw
Spondoolies is now part of Blockstream: https://blog.blockstream.com/en-blockstream-mining-builds-momentum-with-spondoolies-acquisition/
Kaspa is a POW cryptocurrencty which implements GhostDAG protocol: https://kaspanet.org/
1714066613
Hero Member
*
Offline Offline

Posts: 1714066613

View Profile Personal Message (Offline)

Ignore
1714066613
Reply with quote  #2

1714066613
Report to moderator
1714066613
Hero Member
*
Offline Offline

Posts: 1714066613

View Profile Personal Message (Offline)

Ignore
1714066613
Reply with quote  #2

1714066613
Report to moderator
Advertised sites are not endorsed by the Bitcoin Forum. They may be unsafe, untrustworthy, or illegal in your jurisdiction.
Biodom
Legendary
*
Offline Offline

Activity: 3738
Merit: 3844



View Profile
July 29, 2014, 09:37:00 PM
 #4702

For customers receiving units before October, we will adjust the price of your machines consistent with the 4.5TH/s +- 5% hash rate. Compensation will be based on preserving the $/GH ratio of the original deal. Starting in October, we will compensate you for the differential in hashing power according to each customer's preference. We will contact each and every one of you over the next few weeks to discuss your preferred method of compensation.

Early thoughts likely to be amended....

Whilst I appreciate that you will compensate buyers, $/GH isn't the only factor.

They've gone from 0.4w/GH to 0.67w/GH which significantly impacts both the running costs AND the length of time these will be viable to run.

Yes, this did not receive any mention in the original statement. I am at a loss, however, at the 0.55W/Gh number that was a secondary comment.
If it is 0.55W/GH for 4500GH, then it is 2475W, which is exactly what was expected. Confused as to where the 3kw number is coming from.
dogie
Legendary
*
Offline Offline

Activity: 1666
Merit: 1183


dogiecoin.com


View Profile WWW
July 29, 2014, 09:39:59 PM
 #4703

EEs please comment on how a 1200W supply can provide the 1500W of power.

ME here, but its not the same thing. Its 1200W rated output, 1500W input. Ie its drawing 1500W at the wall to generate 1200W of usable power for the components. [realistically its probably 1500, 1350 or so]

Guy Corem (OP)
Donator
Legendary
*
Offline Offline

Activity: 1414
Merit: 1051


Spondoolies, Beam & DAGlabs


View Profile WWW
July 29, 2014, 09:40:40 PM
 #4704

For customers receiving units before October, we will adjust the price of your machines consistent with the 4.5TH/s +- 5% hash rate. Compensation will be based on preserving the $/GH ratio of the original deal. Starting in October, we will compensate you for the differential in hashing power according to each customer's preference. We will contact each and every one of you over the next few weeks to discuss your preferred method of compensation.

Early thoughts likely to be amended....

Whilst I appreciate that you will compensate buyers, $/GH isn't the only factor.

They've gone from 0.4w/GH to 0.67w/GH which significantly impacts both the running costs AND the length of time these will be viable to run.

Yes, this is did not receive any mention in the original statement. I am at a loss, however, at the 0.55W/Gh number that was a secondary comment.
If it is 0.55W/GH for 4500GH, then it is 2475W, which is exactly what was expected. Confused as to where the 3kw number is coming from.

July-September batches: 4500GHs +- 5% with 3000 Watt at the wall
October and later batches: 5500GHs +- 5% with 3000 Watt at the wall

New Mimblewimble implementation: https://www.beam.mw
Spondoolies is now part of Blockstream: https://blog.blockstream.com/en-blockstream-mining-builds-momentum-with-spondoolies-acquisition/
Kaspa is a POW cryptocurrencty which implements GhostDAG protocol: https://kaspanet.org/
frisco
Full Member
***
Offline Offline

Activity: 176
Merit: 100


View Profile
July 29, 2014, 09:43:00 PM
 #4705

1200W output after the voltage conversion (indeed 1350W as it is overvolted) - 1500W input at wall
voltage conversion always adds specially when you are out of the 70-90% load of the PSU.

Anyway the SP30 have ended being a slighty improved 3xSP10 (25% W/H improvement).

I am waiting to see the details but a 25% refund based on buy price when the SP30 is 25% slower and 20% more power hungry doesn't help, hosting prices will be 20% higher so ROI will be greatly hurt.
Refund should be based on the same W/H, not overclocking the SP30 as you are doing to try to reduce the H/s issue.

Tigggger
Legendary
*
Offline Offline

Activity: 1098
Merit: 1000



View Profile
July 29, 2014, 09:44:41 PM
 #4706

They've gone from 0.4w/GH to 0.67w/GH which significantly impacts both the running costs AND the length of time these will be viable to run.

There was never a 0.4w/GH for the full system. 0.5W/GH was what I used for my calculations and I am sure that downclocking will be possible just like with SP10.

http://www.spondoolies-tech.com/products/sp30-yukon-september-batch-1

6TH, 2500w is what it says, but using Guy's figure of 2700w that's still 0.45w/GH -> 0.67w/GH which is a 40% increase.

This affects the running costs, profitability and lifetime of the machine, and should also be considered when deciding compensation.

mrpark
Sr. Member
****
Offline Offline

Activity: 364
Merit: 250


View Profile
July 29, 2014, 09:44:46 PM
 #4707

For customers receiving units before October, we will adjust the price of your machines consistent with the 4.5TH/s +- 5% hash rate. Compensation will be based on preserving the $/GH ratio of the original deal. Starting in October, we will compensate you for the differential in hashing power according to each customer's preference. We will contact each and every one of you over the next few weeks to discuss your preferred method of compensation.

Early thoughts likely to be amended....

Whilst I appreciate that you will compensate buyers, $/GH isn't the only factor.

They've gone from 0.4w/GH to 0.67w/GH which significantly impacts both the running costs AND the length of time these will be viable to run.

Yes, this is did not receive any mention in the original statement. I am at a loss, however, at the 0.55W/Gh number that was a secondary comment.
If it is 0.55W/GH for 4500GH, then it is 2475W, which is exactly what was expected. Confused as to where the 3kw number is coming from.

July-September batches: 4500GHs +- 5% with 3000 Watt at the wall
October and later batches: 5500GHs +- 5% with 3000 Watt at the wall

What does it hash at @110v and what is the sound level (db).

BTC: 1JDjCGtxtxoZ46XgTqUoXBDxNFKwcsEmik
Biodom
Legendary
*
Offline Offline

Activity: 3738
Merit: 3844



View Profile
July 29, 2014, 09:47:17 PM
 #4708

For customers receiving units before October, we will adjust the price of your machines consistent with the 4.5TH/s +- 5% hash rate. Compensation will be based on preserving the $/GH ratio of the original deal. Starting in October, we will compensate you for the differential in hashing power according to each customer's preference. We will contact each and every one of you over the next few weeks to discuss your preferred method of compensation.

Early thoughts likely to be amended....

Whilst I appreciate that you will compensate buyers, $/GH isn't the only factor.

They've gone from 0.4w/GH to 0.67w/GH which significantly impacts both the running costs AND the length of time these will be viable to run.

Yes, this is did not receive any mention in the original statement. I am at a loss, however, at the 0.55W/Gh number that was a secondary comment.
If it is 0.55W/GH for 4500GH, then it is 2475W, which is exactly what was expected. Confused as to where the 3kw number is coming from.

July-September batches: 4500GHs +- 5% with 3000 Watt at the wall
October and later batches: 5500GHs +- 5% with 3000 Watt at the wall

OK, great. Then, the 0.55Gh/w is at the instrument level? From the point of view of consumer, it is 0.67W/Gh because I am getting 4.5TH and pay for 3kw to my power provider.
I am just trying to see where the numbers are coming from.
frisco
Full Member
***
Offline Offline

Activity: 176
Merit: 100


View Profile
July 29, 2014, 09:50:36 PM
 #4709

They've gone from 0.4w/GH to 0.67w/GH which significantly impacts both the running costs AND the length of time these will be viable to run.

There was never a 0.4w/GH for the full system. 0.5W/GH was what I used for my calculations and I am sure that downclocking will be possible just like with SP10.

http://www.spondoolies-tech.com/products/sp30-yukon-september-batch-1

6TH, 2500w is what it says, but using Guy's figure of 2700w that's still 0.45w/GH -> 0.67w/GH which is a 40% increase.

This affects the running costs, profitability and lifetime of the machine, and should also be considered when deciding compensation.

And all hosting quotes we got are for 2500W and no one saus a word to say it was 2700W (even hashplex hash SP30 listed as 2500W https://hashplex.com/frequently-asked-questions/)

Another problem could be pushing the PSUs to that limit, being server grade is not the same as "unlimited powa" a 10% over specs sounds risky so I hope the FW is on the safe zone to avoid burning the PSUs
noodle73
Member
**
Offline Offline

Activity: 71
Merit: 10



View Profile
July 29, 2014, 09:51:38 PM
 #4710

Well, at least we know where we are now. Guy, thanks for all your hard work and honest communication. Well done for finding an equitable solution to the shortfall - I trust it will apply fairly to the Roadstress Group Buy customers as well as those who paid full retail. New tech is always problematic...
Guy Corem (OP)
Donator
Legendary
*
Offline Offline

Activity: 1414
Merit: 1051


Spondoolies, Beam & DAGlabs


View Profile WWW
July 29, 2014, 09:52:33 PM
 #4711

Another problem could be pushing the PSUs to that limit, being server grade is not the same as "unlimited powa" a 10% over specs sounds risky so I hope the FW is on the safe zone to avoid burning the PSUs
We're doing the same with SP10, with the approval of the manufacturer

New Mimblewimble implementation: https://www.beam.mw
Spondoolies is now part of Blockstream: https://blog.blockstream.com/en-blockstream-mining-builds-momentum-with-spondoolies-acquisition/
Kaspa is a POW cryptocurrencty which implements GhostDAG protocol: https://kaspanet.org/
Guy Corem (OP)
Donator
Legendary
*
Offline Offline

Activity: 1414
Merit: 1051


Spondoolies, Beam & DAGlabs


View Profile WWW
July 29, 2014, 09:53:35 PM
 #4712

Well, at least we know where we are now. Guy, thanks for all your hard work and honest communication. Well done for finding an equitable solution to the shortfall - I trust it will apply fairly to the Roadstress Group Buy customers as well as those who paid full retail. New tech is always problematic...
Thank you. It will.

New Mimblewimble implementation: https://www.beam.mw
Spondoolies is now part of Blockstream: https://blog.blockstream.com/en-blockstream-mining-builds-momentum-with-spondoolies-acquisition/
Kaspa is a POW cryptocurrencty which implements GhostDAG protocol: https://kaspanet.org/
RoadStress
Legendary
*
Offline Offline

Activity: 1904
Merit: 1007


View Profile
July 29, 2014, 09:54:22 PM
 #4713

And all hosting quotes we got are for 2500W and no one saus a word to say it was 2700W (even hashplex hash SP30 listed as 2500W https://hashplex.com/frequently-asked-questions/)

Another problem could be pushing the PSUs to that limit, being server grade is not the same as "unlimited powa" a 10% over specs sounds risky so I hope the FW is on the safe zone to avoid burning the PSUs

Hashplex got the 2500W from the product page, but it was stated a long time ago that for the 6TH/s the units would need 2700W.

BitCoin Operated Boy
Sr. Member
****
Offline Offline

Activity: 462
Merit: 250



View Profile
July 29, 2014, 09:55:23 PM
 #4714

For customers receiving units before October, we will adjust the price of your machines consistent with the 4.5TH/s +- 5% hash rate. Compensation will be based on preserving the $/GH ratio of the original deal. Starting in October, we will compensate you for the differential in hashing power according to each customer's preference. We will contact each and every one of you over the next few weeks to discuss your preferred method of compensation.

Early thoughts likely to be amended....

Whilst I appreciate that you will compensate buyers, $/GH isn't the only factor.

They've gone from 0.4w/GH to 0.67w/GH which significantly impacts both the running costs AND the length of time these will be viable to run.

Yes, this is did not receive any mention in the original statement. I am at a loss, however, at the 0.55W/Gh number that was a secondary comment.
If it is 0.55W/GH for 4500GH, then it is 2475W, which is exactly what was expected. Confused as to where the 3kw number is coming from.

July-September batches: 4500GHs +- 5% with 3000 Watt at the wall
October and later batches: 5500GHs +- 5% with 3000 Watt at the wall

Not sure why people of Aug-Sept orders have to wait until October for compensation.

Yeah I don't get it neither...

Hopefully they will start answering e-mails now as I have got few questions...
frisco
Full Member
***
Offline Offline

Activity: 176
Merit: 100


View Profile
July 29, 2014, 09:57:12 PM
 #4715

And all hosting quotes we got are for 2500W and no one saus a word to say it was 2700W (even hashplex hash SP30 listed as 2500W https://hashplex.com/frequently-asked-questions/)

Another problem could be pushing the PSUs to that limit, being server grade is not the same as "unlimited powa" a 10% over specs sounds risky so I hope the FW is on the safe zone to avoid burning the PSUs

Hashplex got the 2500W from the product page, but it was stated a long time ago that for the 6TH/s the units would need 2700W.

If you can point us where, it will be great.
midyatspor
Member
**
Offline Offline

Activity: 107
Merit: 10


View Profile
July 29, 2014, 09:57:32 PM
 #4716

Basically the co. over promised and under delivered, this is not the way to do business and is the reason why I will never buy a Pre-Sale, I bet the co. knew there would be issues with hardware hence no refund. Currently I only buy from companies that sell from stock, When Spondoolies sells from stock is the day I place an order.


Biodom
Legendary
*
Offline Offline

Activity: 3738
Merit: 3844



View Profile
July 29, 2014, 09:59:39 PM
 #4717

Basically the co. over promised and under delivered, this is not the way to do business and is the reason why I will never buy a Pre-Sale, I bet the co. knew there would be issues with hardware hence no refund. Currently I only buy from companies that sell from stock, When Spondoolies sells from stock is the day I place an order.




What are you talking about? they were selling SP-10 from stock for quite a while.
Guy Corem (OP)
Donator
Legendary
*
Offline Offline

Activity: 1414
Merit: 1051


Spondoolies, Beam & DAGlabs


View Profile WWW
July 29, 2014, 10:00:26 PM
 #4718

... I bet the co. knew there would be issues with hardware ...
Not true. We got nasty surprise.


New Mimblewimble implementation: https://www.beam.mw
Spondoolies is now part of Blockstream: https://blog.blockstream.com/en-blockstream-mining-builds-momentum-with-spondoolies-acquisition/
Kaspa is a POW cryptocurrencty which implements GhostDAG protocol: https://kaspanet.org/
bitcoinarnold
Member
**
Offline Offline

Activity: 63
Merit: 10


View Profile
July 29, 2014, 10:00:44 PM
 #4719

sp30



Good luck Spondoolies!
wh00per
Hero Member
*****
Offline Offline

Activity: 571
Merit: 500



View Profile
July 29, 2014, 10:01:54 PM
 #4720

Thank you. It will.

Thanks a lot for the hard work of keeping us informed, for the delivery in time, and the compensation plan in place.

Much appreciated.

CSA/cUL Certified Power Distribution Panels - Basic, Switched, Metered. 1-3 phases. Up to 600V. NMC:N4F9qvHz11BHcc4nh1LCJFsrZhA1EWgVwj
Pages: « 1 ... 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 [236] 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 ... 725 »
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!